My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0544282
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2026 11:06:17 AM
Creation date
6/23/2026 9:01:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544282
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosynteco <br /> consultants <br /> 5.5 Investigation-Derived Waste Management <br /> Decontamination fluids and purged groundwater from sampling will be collected in 55- <br /> gallon drums and temporarily stored on-site, pending analytical results. Composite <br /> investigation-derived waste (IDW) samples will be collected from the 55-gallon drums <br /> by Confluence after the sampling of the wells and decontamination of equipment has been <br /> completed.The IDW samples will be sent to TestAmerica for analysis under the standard <br /> chain-of-custody, sample packaging, and sample shipment procedures. <br /> The IDW sample will be analyzed for the following: <br /> • TPH by EPA Method 8015B. <br /> • VOCs by EPA Method 8260B. <br /> • Title 22 metals by EPA Methods 6010B and 7470A. <br /> The IDW samples will be run on a standard(two-week)turn-around time.After the IDW <br /> analytical results are received from the laboratory, they will be provided to American <br /> Integrated Services of Wilmington, California (AIS) for profiling. Based on the profile, <br /> the IDW will be classified as non-hazardous, hazardous, or California hazardous waste, <br /> and AIS will select an appropriate waste disposal facility. If requested by the waste <br /> disposal facility, additional analysis may be run on the IDW sample. Once the IDW has <br /> been accepted for disposal by the disposal facility, the waste manifest will be sent to the <br /> Port for signature. The Port will sign the waste manifest and the IDW drums will be <br /> transported off-site by AIS to the disposal facility. <br /> RRI Groundwater Monitoring Work Plan 25 1 June 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.