Laserfiche WebLink
Geosyntec D <br /> consultants <br /> Following groundwater sampling, the boreholes will be tremie grouted to the surface in <br /> accordance with SJCDEH requirements. Boreholes will be completed to match the <br /> surrounding ground surface. <br /> All IDW (i.e. a soil and decontamination water) will be contained in United States <br /> Department of Transportation rated 55-gallon drums pending analysis. The waste <br /> disposal procedures will follow those described in Section 5.6 of this report. <br /> 6.3.2 Monitoring Well Installations <br /> Monitoring well installation activities will be conducted in accordance with the SOP in <br /> Appendix K. <br /> RRI Groundwater Monitoring Work Plan 30 1 June 2018 <br />