Laserfiche WebLink
h. The Flood Protection Development Impact Fee shall be required for this application. The fee is due <br /> and payable prior to issuance of the building permit. The fee will be-based on the current schedule <br /> at the time of payment. (Resolutions R-22-135) <br /> i. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high-chain link fence or <br /> equal when the maximum design depth-is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan-for review and approval, prior to <br /> release of building permit. (Development Title Section 9-606)- <br /> j. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> k. This project is subject to the NPDES Region-Wide Permit requirements and shall comply with the <br /> following conditions. Prior to release of the building permit, plans and calculations shall be <br /> submitted and approved by the Public Works Department—Water Resources Division (209-468- <br /> 9360): <br /> i. Treatment: A registered professional engineer shall-design the site to treat the 85th percentile <br /> storm as defined in-the County's 2023 Storm Water Quality Control Criteria Plan (SWQCCP). <br /> ii. Hydromodification: A registered professional engineer shall design the site to comply with the <br /> volume reduction requirement outlined in the County's 2023 SWQCCP. <br /> iii. Trash: A registered professional engineer shall design the site to comply with the trash control <br /> requirement outlined in the County's 2023 SWQCCP. <br /> I. Prior to release of the building permit, the owner shall enter into an agreement-with San Joaquin <br /> County for post-construction maintenance of stormwater quality facilities. <br /> m. Prior to release of the building permit-the applicant shall submit a Storm Water Quality Control- <br /> Plan (SWQCP) to Public Works that complies with all requirements of the 2023 SWQCCP: <br /> n. Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all required <br /> records, updates, test results and inspection reports-shall be maintained on the construction site <br /> and be available for review upon request. <br /> o. Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br /> (SWRCB)and comply with the State"General Permit for Storm Water Discharges Associated with <br /> Construction Activity". The Waste Discharge Identification Number (WDID), issued by SWRCB, <br /> shall be submitted to Public Works prior to release of the building permit. Contact the SWRCB at <br /> 1-866-563-3107 for further information. <br /> p. Prior to release of the building permit all new construction and the substantial improvement of any <br /> structure or tanks in the area of special flood hazard shall be elevated or floodproofed irf- <br /> accordance with San Joaquin County Ordinance Code Section 9-703. Plans and calculations shall <br /> be submitted and approved by the Public Works Department— Water Resources Division (209- <br /> 953-7948) <br /> q. All utilities shall be underground except power transmission facilities of a 35 KV or greater. Public <br /> utility easements shall be provided along the road frontage of the subdivision and as required by <br /> the public utility companies. (Development Title Section 9-609.020) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact: [209] 468-3420. See memo dated August 19, <br /> 2025) <br /> a. A soil suitability and nitrate loading study incorporating proposed staff and customer use shall be <br /> PA-2600098—Conditions of Approval 4 <br />