Laserfiche WebLink
3. All lighting shall be on a time clock or photo-sensor system so as to be turned off during daylight <br /> hours and during any hours when the parking area is not in use. This requirement does not <br /> apply to security lighting. (Development Title Section 9406.060[m][2]) <br /> I. SIGNS: Sign details shall.be consistent with Chapter 9408 of the Development Title and be included- <br /> on the Site Plan.All portions of any sign shall be set back a minimum of 5 feet from existing-and future <br /> right-of-way lines and shall not-block pedestrian or vehicle rights-of-way-or obstruct drivers' visibility. <br /> (Development Title Section 9408.070[p]) <br /> m. MITIGATION MONITORING AND REPORTING PROGRAM: The project shall comply with all <br /> required mitigations included in the MMRP dated April 2025. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209]4-6-8-3000. See memo dated August 22, 2025, and <br /> July 27, 2026) <br /> a. An encroachment permit shall be required for all work within road right-of-way (Note: Driveway <br /> encroachment permits are for flatwork only-all vertical-features, including but not limited to fences, <br /> walls, private light standards, rocks, landscaping and cobbles are not allowed-in the right-of-way.) <br /> (Development Title Sections 9-607.020 and 9-607.040) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Improvement Standards Drawing No. 17 [return radii for truck-trailer egress shall- be <br /> designed to prevent encroachment onto opposing lanes of traffic] prior to issuance of the <br /> occupancy permit. (Development Title Section 9-607.040) <br /> c. If the applicant intends to utilize STAA trucks with this project approval,-then applicant shall obtain <br /> from the Department of Public Works and Caltrans a STAA terminal and STAA route designations <br /> for the proposed facility. Contact the Transportation Engineering Division of the Department of <br /> Public Works(209-468-3707) for designation process. <br /> d. The frontage(roadway) improvements fer FrenGh Camp Re-ad sh-all be in t <br /> Armanre <br /> with the stand-a rd-s fA-.r A_ne half of a (an) 84 feet wide right of way UFban Arteria I/Expressway. <br /> San ieaqUiR. improvement plans, speGifiGatiens and engineer's estimate prepared by a-FegiSt <br /> GiVil engineershall be fp-r review and are subject to plan GheGk, field inspeGtien fees <br /> must be approved by the County of San joaquin Department of PubliG Works prior to issuan <br /> R 92-844) <br /> e. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee will be based on the current schedule at the time <br /> of payment. The fee-shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published-by the Engineering News Record. (Resolutions R-00-433) <br /> f. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (Resolution R-06-38) <br /> g. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. The fee will be based on.the current <br /> schedule at the time of payment. (Development Title Section 9-803.020 and Resolutions R-91-327, <br /> R-94-185 and R-97-5) <br /> PA-2600098-Conditions of Approval 3 <br />