Laserfiche WebLink
4;� Wo <br /> Saa r�rtguur L�ouaty <br /> vorking fur Yoll <br /> RECOMMENDATIONS: <br /> 1) An encroachment permit shall be required for all work within road right-of-way. (Note: <br /> Driveway encroachment permits are for flatwork only— all vertical features, including but <br /> not limited to fences, walls, private light standards, rocks, landscaping and cobbles are not <br /> allowed in the right-of-way.) (Development Title Sections 9-607.020 and 9-607.040) <br /> 2) The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No. 17 [return radii for truck-trailer egress <br /> shall be designed to prevent encroachment onto opposing lanes of traffic] prior to issuance <br /> of the occupancy permit. (Development Title Section 9-607.040) <br /> 3) If the applicant intends to utilize STAA trucks with this project approval, then applicant shall <br /> obtain from the Department of Public Works and Caltrans a STAA terminal and STAA route <br /> designations for the proposed facility. Contact the Transportation Engineering Division of <br /> the Department of Public Works (209-468-3707) for designation process. <br /> GGRfern;aRGe with the standards fE)F E)Re half Gf a (aR) 84 foGt wade Fight of way WrbaR <br /> and engineer's estimate prepared by a registeFed GiVil engineeF shall be submitted fe <br /> review and aFe subjeGt te plaR GheGk, field iRspeGtiGR fees and must be appmved by the <br /> &44} <br /> 5) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 6) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 7) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee will be based <br /> on the current schedule at the time of payment. (Development Title Section 9-803.020 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> SAN. JOAQUIN <br /> COUNTY <br /> Greotness grows here. <br /> i <br />