Laserfiche WebLink
to<<irl<in� (sir Yoni <br /> 8) The Flood Protection Development Impact Fee shall be required for this application. The <br /> fee is due and payable prior to issuance of the building permit. The fee will be based on the <br /> current schedule at the time of payment. (Resolutions R-22-135) <br /> 9) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-606) <br /> 10) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 11) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-9360): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2023 Storm Water Quality Control Criteria <br /> Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County's 2023 SWQCCP <br /> c) Trash: A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County's 2023 SWQCCP. <br /> 12) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br /> 13) Prior to release of the building permit the applicant shall submit a Storm Water Quality <br /> Control Plan (SWQCP) to Public Works that complies with all requirements of the 2023 <br /> SWQCCP <br /> 14) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request. <br /> 15) Applicant shall file a Notice of Intent (NO]) with the State Water Resources Control Board <br /> (SWRCB) and comply with the State "General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number(WDID), <br /> issued by SWRCB, shall be submitted to Public Works prior to release of the building <br /> permit. Contact the SWRCB at 1-866-563-3107 for further information. <br /> SAN JOAQUIN <br /> COUNTY <br /> Greatness grows here. <br />