Laserfiche WebLink
Tiered Permitting: <br />• Violation #18— Open. Proof that the leak was repaired has not been submitted. Additionally, <br />supporting documentation verifying that all of the requirements for a commercial laundry facility <br />have been met has not been submitted. See original inspection report. The tank will be repaired in <br />the next six weeks. Completed conveyance & container PMs are attached. We do not have a log <br />that asks "Was the skimmer run at end of day" and we also do not have a training binder in the <br />treatment area. Where these notes from a different inspection/ facility? <br />Regards, <br />Daniel Bell I Maintenance Supervisor <br />Cintas Corporation I Loc. 922 <br />office 209.922.0500 1 cell 209.275.3770 <br />1877 Industrial Dr. i Stockton, CA 95206 <br />Belld(@cintas.com I cintas.com <br />CIN05. -500 <br />;EG9ITMIFE_ <br />READY POP rTMP ti+rOaKoar ..._� <br />From: Sammons, Lynsey [EHD] <Isammons@slgov.org> <br />Sent: Friday, April 3, 2026 2:50 PM <br />To: Bell, Daniel <BeIID@cintas.com>; Koehler, Stephen <KoehlerS@cintas.com>; Galvin, Randy <GalvinR@cintas.com> <br />Cc: Alaniz, John [EHD] <ialanizl@slgov.org>; Presto, Carol [EHD] <cpresto@slgov.org> <br />Subject: RE: PR0526787, PR0528710, PR0529127 - 1877 Industrial Dr - HMBP, SQG HW, TP CE -CL Checklists 2025 - 7.8.25 <br />Good afternoon, <br />We were able to review the Return to Compliance documents and CERS submittals you've made. Three <br />violations were closed from the HMBP inspection. All other violations remain open. Please see the <br />feedback below: <br />HMBP: <br />• Violation #5 — Closed <br />• Violation #10— Closed <br />• Violation #11 — Closed <br />• Violation #12— Open. The evacuation plans are not included in the updated Emergency Response <br />Plan submitted to CERS. <br />• Violation #13— Open. The training plan submitted does not cover evacuation procedures. <br />• Violation #14— Open. HMBP training must include the facility's emergency response contingency <br />plan. The plan submitted to CERS does not cover evacuation procedures (see violation #13). <br />Please submit training records demonstrating that employees have been provided HMBP training <br />including the content of an adequate emergency response contingency plan that covers <br />evacuation procedures. <br />Hazardous Waste: <br />Violation #2— Open. Proof of hazardous waste training has not been submitted. <br />Violation #11 — Open. <br />