My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601360
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROSSI
>
985
>
2600 - Land Use Program
>
SU-2601360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2026 10:07:03 AM
Creation date
7/6/2026 12:57:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601360
PE
2689 - GP AMENDMENT 5-9.9 acres (GP)
STREET_NUMBER
985
Direction
S
STREET_NAME
ROSSI
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
15944046
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
985 S ROSSI AVE STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG , Inc . <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc. staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> C. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> • Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States(pursuant to Section 404 Clean WaterAct], it would require <br /> the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 days. It maybe prudent to obtain a <br /> preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed on the project site, the Corps and the Regional Water <br /> Quality Control Board(RWQCB) would have regulatory authority over those mapped areas[pursuant to Section 404 and 401 of the Clean WaterAct <br /> respectively]and permits would be required from each of these resource agencies prior to grading the project site. <br /> If you have any questions, please call (209) 235-0574. <br />
The URL can be used to link to this page
Your browser does not support the video tag.