Laserfiche WebLink
31SJCOG , Inc . <br /> a , r, S J C O G, Inc. <br /> San Joaquin County Multi-Species Habitat Conservation dam' Open Spare Plall <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0574 • Email: bovd@sjcog.org <br /> SJMSCP HOLD <br /> w TO: Local Jurisdiction: Community Development Department Planning Department Building <br /> Department Engineering Department Survey Department Transportation Department <br /> Other: <br /> -FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six (6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant, SJCOG,Inc. staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> INNER ,�.:. 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs.-� —' 3. Upon issuance of Polly executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> i <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title; or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> jb. Dedicate land in-lieu of fees, either as conservation easements or fee title; or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-2600169 (GP) <br /> Assessor Parcel #s: Multiple APNs <br /> 1 T R , Section(s): _ <br /> tr Local Jurisdiction Contact: Francisco Prado <br /> �- The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />