My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501037 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2900 - Site Mitigation Program
>
SR2501037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:49:26 AM
Creation date
7/17/2026 11:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501037
PE
2900 - Site Mitigation Program
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
440 W DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440, 441, and 508 West Charter Way, 1426 and 1444 South Lincoln Street, Stockton, CA <br /> TOC Borehole Casing Bentonite Seal Cement Seal Water- <br /> Installation Destruction Total Depth Casing Slot Size Screened Interval Filter Pack Interval <br /> Location ID Elevation Diameter Diameter Interval Interval Bearing Comments <br /> Date Date (feet) (feet bgs) (inches) (inches) Material (inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) Zone <br /> • <br /> Soil Borings(B) <br /> B-1 07/16/91 31.5 8 0-31.5 <br /> B-2 07/16/91 42.5 8 0-42.5 <br /> B-3 07/17/91 21.5 8 0-21.5 <br /> B-4 07/17/91 21.5 8 0-21.5 <br /> B-5 04/27/92 56 10 - See MW-1 for details <br /> B-6 04/28/92 56 10 - See MW-2 for details <br /> B-7 04/29/92 41 6.25 041 <br /> B-8 05/05/92 56 10 - See MW-3 for details <br /> B-9 05/06/92 41 10 See VW-1 for details <br /> B-10 05/07/92 40 10 See VW-2 for details <br /> B-11 05/07/92 40 10 - See VW-3 for details <br /> B-12 05/06/92 40 8 040 <br /> B-13 01/11/93 41 8.25 - See VW4 for details <br /> B-14 01/11/93 57 10.25 - See MW4 for details <br /> B-15 01/12/93 14.5 6.5 0-14.5 <br /> B-16 01/12/93 57 10.25 - See MW-5 for details <br /> B-17 01/12/93 26 8.25 See VW-5 for details <br /> B-18 01/13/93 40 8.25 See VW-6 for details <br /> B-19 01/13/93 41 8.25 See VW-7 for details <br /> B-20 10/06/93 53 8.25 See MW-6 for details <br /> B-21 10/07/93 50 8.25 See MW-7 for details <br /> B-22 07/24/96 26 10 See VW-13 for details <br /> B-23 07/24/96 26 10 See VW-12 for details <br /> B-24 07/24/96 26 10 See VW-1 1 for details <br /> B-25 07/24/96 26 10 - See VW-10 for details <br /> B-26 07/10/15 55 6.5 0-55 <br /> B-27 07/10/15 55 6.5 0-55 <br /> B-28 07/02/15 10 3 0-10 <br /> B-29 07/02/15 10 3 0-10 <br /> Angle Boring(B) <br /> B-13 05/12/95 26 8 0-26 <br /> Monitoring Wells(MW) <br /> AMW-1 04/27/92 11.65 56 10 4 SCH.40 PVC 0.02 36-56 33.5-56 31-33.5 0-31 B Installed in B-5 <br /> AMW-1B 08/01/00 11.46 90 16/8 2 SCH.40PVC 0.020 75-90 72-90 45-72 0-45 C <br /> AMW-1C 07/31/00 11.58 120 16/8 2 SCH.40 PVC 0.020 105-120 102-120 45-102 045 D <br /> AMW-2 04/28/92 12.11 56 10 4 SCH.40 PVC 0.02 36-56 33-56 29-33 0-29 B Installed in B-6 <br /> AMW-3 05/05/92 - 13.06 56 10 4 SCH.40 PVC 0.02 34.5-54.5 32.5-56 30-32.5 0-30 B Installed in B-8 <br /> AMW-4 01/11/93 10/03/05 - 57 10.25 4 SCH.40 PVC 0.02 36.5-56.5 35-57 32.5-35 0-32.5 B Installed in B-14 <br /> AMW-5 01/12/93 - 11.72 57 10.25 4 SCH.40 PVC 0.02 37-57 35-57 32.5-35 0-32.5 B Installed in B-16 <br /> AMW-6 10/06/93 10.62 53 8.25 2 SCH.40 PVC 0.02 30-50 29-53 25-29 0-25 B Installed in B-20 <br /> AMW-7 10/07/93 10.51 50 8.25 2 SCH.40 PVC 0.02 30-50 28-50 25-28 0-25 B Installed in B-21 <br /> AMW-8 08/02/00 12.73 30 8 2 SCH.40 PVC 0.020 15-30 13-30 11-13 0-11 A <br /> AMW-8B 08/02/00 12.45 90 16/8 2 SCH.40 PVC 0.020 75-90 1 72-90 1 45-72 1 045 1 C <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 1 of 8 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.