My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501037 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2900 - Site Mitigation Program
>
SR2501037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:49:26 AM
Creation date
7/17/2026 11:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501037
PE
2900 - Site Mitigation Program
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
440 W DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440, 441, and 508 West Charter Way, 1426 and 1444 South Lincoln Street, Stockton, CA <br /> TOC Borehole Casing Bentonite Seal Cement Seal Water- <br /> Installation Destruction Total Depth Casing Slot Size Screened Interval Filter Pack Interval <br /> Location ID Elevation Diameter Diameter Interval Interval Bearing Comments <br /> Date Date (feet) (feet bgs) (inches) (inches) Material (inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) Zone <br /> CMW-76 1/18-23/08 12.07 38 14/8 2 SCH.40 PVC 0.010 33-38 31-38 29-31 0-29,0-29 A <br /> CMW-7C 1/17-24/08 12.06 60 14/8 2 SCH.40 PVC 0.010 50-60 47.9-60 45.9-47.9 0-43.5,0-45.9 B <br /> CMW-8C 07/08/15 11.97 90 8.25 2 SCH.40 PVC 0.010 80-90 77-90 75-77 0-77 C <br /> Air Sparge Wells(AS) <br /> AS-1 10/31/11 - 44.5 10 2 SCH.40 PVC 0.020 39-41 37-41.5 34-37 0-34 41.5-44.5 ft bgs filled with sluff <br /> AS-2 11/04/11 30.5 10 2 SCH.40 PVC 0.020 25-27 23-27.5 20-23,28-30.5 0-20 27.5-28 ft bgs filled with sluff <br /> AS-3 10/22/12 39 10 2 SCH.40 PVC 0.020 35-37 33-39 31-33 0-31 <br /> AS-4 10/22/12 38 10 2 SCH.40 PVC 0.020 34-36 32-38 30-32 0-30 <br /> AS-5 10/23/12 37 10 2 SCH.40 PVC 0.020 31-33 29-35 27-29,35-37 0-27 <br /> AS-6 10/18/12 34.5 10 2 SCH.40 PVC 0.020 28-30 26-32 24-26,32-34.5 0-24 <br /> AS-7 10/19/12 32 10 2 SCH.40 PVC 0.020 28-30 26-32 24-26 0-24 <br /> AS-8 10/17/12 41 10 2 SCH.40 PVC 0.020 30-32 28-34.5 26-28,34.5-41 0-26 <br /> AS-9 10/17/12 36 10 2 SCH.40 PVC 0.020 32-34 30-36 28-30 0-28 <br /> AS-10 10/23/12 38.5 10 2 SCH.40 PVC 0.020 34-36 32-38.5 30-32 0-30 <br /> AS-11 10/19/12 32 10 2 SCH.40 PVC 0.020 28-30 26-32 24-26 0-24 <br /> AS-12 10/24/12 37 10 2 SCH.40 PVC 0.020 33-35 31-37 29-31 0-29 <br /> Vapor Extraction Wells(VE) <br /> VE-1 11/04/11 16.5 10 4 SCH.40 PVC 0.020 11-16 9-16.5 6-9 0-6 <br /> VE-2 10/16/12 16 10 4 SCH.40 PVC 0.020 10.5-15.5 10-16 7-10 0-7 <br /> VE-3 10/16/12 17 10 4 SCH.40 PVC 0.020 11.5-16.5 11-17 8-11 0-8 <br /> VE-4 10/15/12 16 10 4 SCH.40 PVC 0.020 10.5-15.5 10-16 7-10 0-7 <br /> VE-5 10/16/12 16 10 4 SCH.40 PVC 0.020 10.5-15.5 10-16 7-10 0-7 <br /> VE-6 10/15/12 16 10 4 SCH.40 PVC 0.020 10.5-15.5 10-16 7-10 0-7 <br /> Piezometers(PZ) <br /> PZ-1 11/04/11 16.5 10 4 SCH.40 PVC 0.020 11-16 9-16.5 5.5-9 0-5.5 <br /> PZ-2 11/04/11 16.5 10 4 SCH.40 PVC 0.020 11-16 9-16.5 5.5-9 0-5.5 <br /> Cone Penetrometer Test(CPT) <br /> CPT-1 07/23/05 73 - - - - - - - <br /> CPT-2 07/20/05 87 <br /> CPT-3 07/20/05 92 <br /> CPT-4 07/19/05 88 <br /> CPT-5 07/18/05 60 <br /> CPT-6 07/23/05 59 <br /> CPT-7 07/23/05 57 <br /> CPT-8 07/21/05 100 <br /> CPT-9 07/21/05 58 <br /> CPT-10 07/23/05 67 <br /> Soil Borings(SB,C,and CT) <br /> SB-1 02/07/96 41.5 0-41.5 <br /> SB-2 02/07/96 41.5 - 0-41.5 <br /> C1 05/01/07 44 2.25 0-44 <br /> C2 05/02/07 44 2.25 0-44 <br /> C3 05/02/07 46 2.25 0-46 <br /> C4 05/03/07 46 2.25 0-46 <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 4 of 8 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.