My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501037 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2900 - Site Mitigation Program
>
SR2501037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:49:26 AM
Creation date
7/17/2026 11:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501037
PE
2900 - Site Mitigation Program
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
440 W DR MARTIN LUTHER KING JR BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440, 441, and 508 West Charter Way, 1426 and 1444 South Lincoln Street, Stockton, CA <br /> TOC Borehole Casing Bentonite Seal Cement Seal Water- <br /> Installation Destruction Total Depth Casing Slot Size Screened Interval Filter Pack Interval <br /> Location ID Elevation Diameter Diameter Interval Interval Bearing Comments <br /> Date Date (feet) (feet bgs) (inches) (inches) Material (inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) Zone <br /> SP-8 11/08/05 11.84 39 10 1 SCH.80 PVC 0.020 33-35 12-26,31-36 10-12,26-31,36-39 0-10 A <br /> SP-9 11/11/05 12.16 37 10 1 SCH.80 PVC 0.020 32.5-34.5 12-26,30.5-35 10-12,26-30.5,35-37 0-10 A <br /> SP-10 11/14/05 12.08 37 10 1 SCH.80 PVC 0.020 32-34 12-26,31-35 10-12,26-31,35-37 0-10 A <br /> SP-11 11/07/05 13.24 37 10 1 SCH.80 PVC 0.020 31-33 12-26,30-33.5 10-12,26-30,33.5-37 0-10 A <br /> SP-12 11/07/05 14.89 37 10 1 SCH.80 PVC 0.020 31-33 12-26,30-34 10-12,26-30,34-37 0-10 A <br /> SP-13 11/08/05 14.78 37 10 1 SCH.80 PVC 0.020 31-33 12-26,30-34 10-12,26-30,34-37 0-10 A <br /> SP-14 11/09/05 13.64 37 10 1 SCH.80 PVC 0.020 33-35 12-26,31-35.5 10-12,26-31,35.5-37 0-10 B <br /> SP-15 11/15/05 12.33 37 10 1 SCH.80 PVC 0.020 32-34 12-26,31-34.5 10-12,26-31,34.5-37 0-10 A <br /> SP-16 11/15/05 12.23 39 10 1 SCH.80 PVC 0.020 36-38 12-26,34-39 10-12,26-34 0-10 A <br /> SP-17 11/15/05 12.20 41 10 1 SCH.80 PVC 0.020 36-38 12-26,35-38.5 10-12,26-35,38.5-41 0-10 A <br /> SP-18 11/10/05 12.27 37 8 1 SCH.80 PVC 0.020 32-34 30-34.5 27-30,34.5-37 0-27 A <br /> SP-19 11/04/05 12.93 37 8 1 SCH.80 PVC 0.020 31-33 30-33.5 26-30,33.5-37 0-26 A <br /> SP-20 11/09/05 13.71 37 8 1 SCH.80 PVC 0.020 32-34 30-35 27-30,35-37 0-27 A&B <br /> SP-21 11/14/05 14.24 37 8 1 SCH.80 PVC 0.020 32-34 31-34.5 26-31,34.5-37 0-26 A <br /> SP-22 11/11/05 37 1 8 1 1 SCH.80 PVC 0.020 1 31-33 1 29-33.5 1 26-29,33.5-37 1 0-26 1 A <br /> Chevron Facility#9-2033 <br /> Soil Borings(SB and DP) <br /> S13-1 03/16/95 36.5 8 - - - - - - 0-36.5 <br /> SB-2 08/30/00 85.0 2 0-85 <br /> SB-3(CPT-01) 08/31/00 94.65 - - <br /> SB-4(CPT-02) 08/31/00 94.16 <br /> S13-5 05/15/01 90.06 <br /> S13-6 05/16/01 90.06 <br /> SB-7 05/16/01 95.14 <br /> SB-8 05/17/01 90.06 - - <br /> DP-1 08/01/05 55 1.5 0-55 <br /> DP-3 07/28/05 61.5 1.5 0-61.5 <br /> DP4 07/27/05 100 1.5 0-100 <br /> DP-5 07/25/05 61.5 1.5 0-61.5 <br /> DP-6 07/26/05 58 1.5 0-58 <br /> DP-7 07/25/05 56.5 1.5 0-56.5 <br /> DP-8 07/29/05 59.5 1.5 0-59.5 <br /> DP-9 08/01/05 55.5 1.5 0-55.5 <br /> DP-10 07/29/05 55.5 1 1.5 1 - 0-55.5 <br /> Monitoring Wells(CMW) <br /> CMW-1 03/15/95 07/09/15 12.05 51.5 8 2 SCH.40 PVC 0.020 30-50 28-51.5 26-28 0-26 X <br /> CMW-2 03/15/95 07/09/15 11.52 51.5 8 2 SCH.40 PVC 0.020 30-50 28-51.5 26-28 0-26 A <br /> CMW-3 03/16/95 07/09/15 10.84 51.5 8 2 SCH.40 PVC 0.020 30-50 28-51.5 26-28 0-26 X <br /> CMW-4A 01/22/08 - 10.80 32 8 2 SCH.40 PVC 0.010 17-27 15-27 13-15 0-13 A <br /> CMW-4C 1/15-25/08 10.80 60 14/8 2 SCH.40 PVC 0.010 50-60 47.9-60 45.9-47.9 0-43.5,0-45.9 B <br /> CMW-5A 01/21/08 11.12 30 8 2 SCH.40 PVC 0.010 17.5-27.5 15.5-27.5 13.5-15.5 0-13.5 A <br /> CMW-5C 1/14-24/08 11.03 60 14/8 2 SCH.40 PVC 0.010 50-60 44-60 42-44 047,0-42 B <br /> CMW-6A 01/22/08 12.00 28 8 2 SCH.40 PVC 0.010 17-27 15-27 13-15 0-13 A <br /> CMW-6C 1/16-25/08 12.03 60 14/8 2 SCH.40 PVC 0.010 50-60 47.9-60 45.9-47.9 0-43.5,0-45.9 B <br /> CMW-7A 01/23/08 12.02 30 1 8 1 2 SCH.40 PVC 0.010 1 17-27 1 15-27 1 13-15 0-13 A <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 3 of 8 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.