My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2026 4:46:47 PM
Creation date
8/3/2026 3:46:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
***SST***NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 GENERAL <br /> 1.01 SUMMARY <br /> A. The Contractor shall be responsible to drill, construct, and develop two <br /> monitoring wells suitable for groundwater sample collection. <br /> B. Contractor shall install groundwater wells in accordance with these specifications <br /> and associated figures. <br /> C. Contractor shall be solely responsible for any damage to equipment, such as drill <br /> rigs, drilling augers, rods, etc. <br /> D. Engineer refers to County's Engineer for the project and/or County's consultant. <br /> 1.02 SUBMITTALS <br /> A. Contractor shall submit the following to the Engineer within fifteen (15) working <br /> days of the award of contract and five days before starting work. <br /> 1. Approved Well Construction Permits <br /> 2. Work schedule, identifying approximate drilling and well inspection time. <br /> 3. Emergency Plan to include location and direction to nearest medical facility, <br /> instructions to provide to emergency vehicles to navigate to the well sites, <br /> emergency procedures, and responsibilities in an emergency. <br /> 4. Contractor's Contact Information <br /> 5. Manufacturer certifications for well casing, well screen, and centralizers <br /> 6. Manufacturer grain size distribution (sieve analysis) of the gravel envelope <br /> material, including a minimum 500 grams of gravel envelope material <br /> 7. Shop Drawings to include the gravel envelope installation diagram and well <br /> development diagram <br /> 8. Manufacturer's Instructions. <br /> 9. Certificates of Compliance. <br /> 1.03 PERMITS <br /> A. Contractor shall notify underground service alert (USA) and have the work area <br /> cleared by underground utility companies before drilling. Contractor will be held <br /> liable for any damages caused by the Contractor by not following the guidelines <br /> set by USA. The Contractor shall provide the USA ticket numbers to the <br /> Engineer 24 hours before drilling. The County will also notify USA. <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 1 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.