My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2026 4:46:47 PM
Creation date
8/3/2026 3:46:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
***SST***NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Permits to drill and install groundwater monitoring wells will be obtained by the <br /> County from San Joaquin County Environmental Health Department (EHD). The <br /> Engineer will provide the Contractor a copy of the approved permit. <br /> 1.04 INSPECTION <br /> A. For the purpose of this section, installation refers to placing material in a <br /> borehole. Well Installation does not include drilling the borehole. <br /> B. Installation of groundwater wells shall be in the presence of EHD inspectors. <br /> C. The Engineer will be in charge of scheduling well installation inspections with <br /> EHD. Contractor shall not coordinate any inspections with the EHD unless <br /> authorized by the Engineer. <br /> D. EHD inspection hours are from 9.00 a.m. to 4.00 p.m. each working day. Well <br /> installation shall be during EHD's inspection hours. <br /> E. Contractor shall provide the Engineer three days' notice for well installation. <br /> Engineer will provide two days' notice to EHD. <br /> 1. Contractor shall confirm with the Engineer the approximate time Contractor's <br /> crew will be ready for the first inspection for a project before 24 hours. <br /> 2. Contractor shall confirm consecutive inspections needed for the project with the <br /> Engineer in the field based on the work progress after the first inspection. The <br /> Contractor will then schedule inspections with EHD inspector. <br /> PART 2 PRODUCTS <br /> 2.01 GENERAL <br /> All materials shall be new and free of defects. Contractor and Engineer shall <br /> inspect materials before installing. Contractor shall replace defective materials at <br /> no additional cost to the County. <br /> 2.02 WELL CASING <br /> The well casing shall be 2-inch Schedule 80, flush-threaded polyvinylchloride <br /> (PVC). Well casing shall be new, individually wrapped, and in 10-foot lengths. A <br /> 2-foot length well sump will be installed on each monitoring well casing. <br /> 2.03 WELL SCREEN <br /> North County G-15&G-16 San Joaquin County <br /> Groundwater Monitoring Well Specifications 2 Public Works Dept <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.