Laserfiche WebLink
MODULE 1-4 <br /> 1. Drainage Ditches <br /> Existing drainage ditches have been inspected and cleaned of vegetation and <br /> debris. <br /> 2. Down Drains <br /> Existing down drains have been inspected and reconnected as needed. <br /> MODULE 5B-6 <br /> 1. Winter Pad <br /> A new winter pad was constructed on the top of Modules 5A and 5B for refuse <br /> disposal during wet weather. The winter pad will be constructed of aggregate <br /> base over compacted refuse. <br /> Part of Winter Pad <br /> 2. Customer Haul Road <br /> The customer haul road from main paved access road has been extended to new <br /> winter pad (Figure 1). <br /> 3. Daily Cover Soil <br /> Daily cover soil will be stockpiled near the winter pad for winter operations. <br /> NC Winterization Plan Page 5 of 6 Printed 9/24/26 <br />