Laserfiche WebLink
Stockpile <br /> 4. Grading <br /> All finish grades of refuse lifts in Module 5B and 6 are graded with 2% slope to <br /> aid storm water runoff. <br /> 5. Drainage <br /> Soil berms will be installed along the downslope edges of Module 5B and 6 to <br /> control surface storm water runoff (Figure 1). Down drains will be installed at the <br /> end of the soil berms to convey storm water to the appropriate place. <br /> 6. Erosion/Sedimentation Control <br /> Mulch has been applied on side slopes of Module 5 and 6. <br /> MODULE 7 <br /> 1. Hydroseeding <br /> Slopes around module 7 will be hydroseeded during the first two weeks of <br /> October. This work was delayed to increase the chance of seeds getting some <br /> moisture to establish roots. <br /> N:\1 North County\Winterization\2026\NC-26 Winterization Plan.docx <br /> NC Winterization Plan Page 6 of 6 Printed 9/24/26 <br />