My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 8:41:15 PM
Creation date
8/13/2026 8:38:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231310
PE
2361 - UST FACILITY
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
351 N BECKMAN RD LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CP26 - UST FULL Inspection Report <br />Date: <br />June 30, 2026 <br />Facility Address: <br />351 N BECKMAN RD, LODIVAN DE POL ENT INC/PACIFIC PRIDE <br />Facility Name: <br />Environmental Health Department <br />9 23 CCR 16 2613(a)(12) and (b), 2691(a); HSC 6.7 25284(a)(3) 2011014 - Facility has submitted a current written <br />owner/operator agreement <br />OBSERVATION: Owner/Operator failed to submit a written agreement between the UST owner and the operator <br />(owner/operator agreement). <br />REGULATION GUIDANCE: Failure to submit a written agreement between the permit holder and operator. <br />CORRECTIVE ACTION: Complete and submit a written agreement between the UST owner and the operator <br />(owner/operator agreement) <br />This is a (Minor) Violation. <br />11 23 CCR 16 2613(c)(6), 2633, 2651(b)(1), 2660(c) and (e), 2663 2031009 - Leak detection equipment tested by qualified <br />service technician every 12 months (TCR 9d) <br />OBSERVATION: Owner/Operator failed to have a properly qualified service technician test leak detection equipment <br />every 12 months. <br />- The leak detection equipment were last tested for functionality on 6/24/2025 <br />REGULATION GUIDANCE: Failure to test release detection equipment every 12 months. <br />CORRECTIVE ACTION: Have a properly qualified service technician test leak detection equipment every 12 months. <br />This is a (Minor) Violation. <br />12 23 CCR 16 2660(d) 2011017 - All test results have been submitted to UPA within 30 days of testing date <br />OBSERVATION: Owner/Operator failed to submit test results to the UPA within 30 days of performing the test. <br />- The Monitoring System Certification and Spill Container Test Results were conducted on 6/24/2025 and were submitted <br />on 8/5/2025, 13 days late. <br />REGULATION GUIDANCE: Failure to submit test results to the UPA within 30 days of performing the test. <br />CORRECTIVE ACTION: Submit test results to UPA within 30 days and ensure all test results are submitted to UPA <br />within 30 days of performing testing. <br />This is a Repeat (Class 2) Violation. <br />30 23 CCR 16 2613(c)(3), 2633, 2640(e), 2642(k), 2660(c) and (e), 2664; HSC 6.7 25284.2 2031001 - Spill buckets meet <br />requirements, have been tested as required, and records kept for 36 mths (TCR 9a) <br />OBSERVATION: Owner/Operator failed to meet one or more of the following spill container requirements: install or <br />maintain spill container which is liquid-tight; has a minimum capacity of five gallons; has a functional drain valve or other <br />method for the removal of liquid from the spill container; is protected from galvanic corrosion; performed tightness test at <br />installation, every 12 months thereafter, and within 30 days after a repair; tested to confirm liquid capacity is no less than <br />five gallons; tested by a certified UST service technician; maintain testing records for 36 months. <br />- The Spill Containers were last tested on 6/24/2025 <br />REGULATION GUIDANCE: Failure to meet one or more of the spill containment requirements. <br />CORRECTIVE ACTION: Install or repair spill buckets to meet all of the listed requirements, have tightness tested using <br />approved method, by certified UST service technician, and submit documentation to verify compliance. Maintain all <br />testing records for 36 months. <br />This is a (Minor) Violation. <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Page 6 of 9EHD - CUPA Inspection Report IS03 <br />CP26 - UST FULL <br />7/2/2026FA0003773 PR0231310 4667951
The URL can be used to link to this page
Your browser does not support the video tag.