Laserfiche WebLink
Record Keeping: <br />All records pertaining to the disposal and/ or recycling of hazardous wastes shall be <br />maintained and available on site for at least three (3) years. For wastes transported on a <br />Uniform Hazardous Waste Manifest, within 30 days of shipment, submit one copy of the <br />manifest to the Department of Toxic Substances Control (DTSC). For Non-RCRA <br />hazardous wastes, describe these wastes in Item 9b on the manifest prior to submitting to <br />DTSC. Use U.S. DOT description and California Hazardous Waste Code Number if <br />listed. Copies of manifests are sent to: DTSC Generator Manifests, P.O. Box 400, <br />Sacramento, CA 95812-0400. If within 35 days of the waste being transported off-site, <br />you do not receive a copy of the signed manifest (signed and dated by the designated <br />facility), then you are to call the transporter and designated facility to determine the <br />status of receiving the manifest. If you do not receive a signed copy of the manifest <br />within 45 days of the waste being transported off site, you are to send a Exception Report <br />to the DTSC. The Exception Report will include: a copy of the manifest; and a cover <br />letter that explains the efforts you have taken to locate the hazardous wastes. Exception <br />Reports are sent to: DTSC Report Repository, Generator Information Services Section, <br />P.O. Box 806, Sacramento, CA 95812-0806. A Biennial Report is due by March 1 of <br />each even -numbered year and covers the previous year of hazardous waste activity. <br />Copies manifests, Exception Reports and Biennial Reports must be retained for three <br />years. <br />Section 3: Prevention of Discharges to the Storm Water System and Sewer System <br />ew*� 1. All discharges of anything, other than clean water to the storm drains, gutter, parking lots <br />or side lots are prohibited. Spills or leaks, which may reach storm or sewer water drains, <br />shall be addressed as detailed below. <br />2. Cleaning and de -greasing of engines or related parts will only be done in areas where run <br />off can be properly treated and legally discharged. <br />3. The Shops have no floor drains. Spills will be cleaned up quickly using absorbent <br />materials available for use in the Shops. <br />4. The Wash Bay's oil -water separator will be managed in accordance with procedures <br />established by the local wastewater treatment facility. <br />Section 4: Spills and Leaks <br />Surface flow on the 2660 Yard flows to the on-site storm drainage ditches, which <br />discharge to drain pipes. The drain pipes at the south end of the property discharge <br />directly to Duck Creek. The storm drain inlets on the north end of the 2660 Yard are <br />located in the employee parking area, and discharge to a storm ditch system that runs east <br />along Loomis Road. <br />Surface flow on the 2710 Yard flows to the on-site storm drain inlets. The storm sewer <br />pipes discharge to a retention basin located at the south end of the property. <br />J.B. Hunt Transport <br />Materials and Waste Handling / Emergency Response Plan 3 <br />