C A M B R I D G E D R I V E m
<br /> z �
<br /> m
<br /> z
<br /> -- - -- -- -
<br /> w u
<br /> �nma
<br /> --
<br /> - -_-,---- - -- — W
<br /> EXIST. DRIVEWAY z r
<br /> Z m Ul
<br /> m r
<br /> L 3j42 EX'ST ANDSCAPE, -f't P �� �i/�i �! ,�' �/ / /,� /
<br /> /� / , L // // / ///// ' �/ // ///: ;// %,� Qom
<br /> / � / �/ 5 QQ000
<br /> L4
<br /> -- / G1�� "
<br /> �- - j1
<br /> u40do i-
<br /> i� N
<br /> f, i IU
<br /> - KEYNOTES
<br /> 1. EXISTING UNDERGROUND STORAGE TANKS (UST6), TO REMAIN. DOUBLE-WALL STEEL TANKS W/ FIEENZ31-ASS REINFORCED PLASTIC (FRP.) JACKET BY
<br /> MODERN WELDING. THREE (3) 20K GALLON TANKS W/ UNLEADED GASOLINE AND (I) 12K GALLON TANK W/ DIESEL.
<br /> f - 2. EXI8TfNG (E) TANK VENT RISERS AND HASSTECH VAPOR RECOVERY SYSTEM, TO REMAIN. INSTALL NEW PCV VALVES AS REQUIRED ON GASOLINE
<br /> TANK VENT RISERS. ju
<br /> II i9 3. EXISTING PRODUCT, VENT AND VAPOR RECOVERY (VR) IN THE TANK AREA, TO REMAIN. PIPING IN THE TANK FIELD NOT SHOWN AND NOT PART OF z � _l
<br /> TX
<br /> W `9
<br /> THIS. WORK SCOPEQ
<br /> Q
<br /> LL
<br /> 4,4. SAWCUT AND REMOVE PORTION OF TANK SLAB, A5 REQUIRED. REMOVE EXIST. FILL AND PHASE I vR DRYBREAK ASSEMBLIES, TYPICAL OF 3. W W = U ? N Q U
<br /> / I i� J XZ3onW)
<br /> F F 11{
<br /> STORE 5. INSTALL NEW F.RP. TANK COLLAR AND SUMPS AS REQUIRED ONTO EXISTING LISTS TYPICAL OF 4. � m U
<br /> 7 PAVING, TY i CO
<br /> EXIST. P NG, P � a_ O
<br /> i z
<br /> EXISTING i '� W 'j' m W � - 1--
<br /> �I I N
<br /> 6, NEW TANK FILL ASSEMBLY W/ 5 GALLON (MIN.) FILL CONTAINMENT (4) AND PHASE I VAPOR RECOVERY AT GA50 IN TANKS (3 / NEW U ' � r .+
<br /> R L E J W IN E SMP W/ c� U
<br /> F
<br /> I// d EXIST. PAVING, TYP. ��/ NEW FLOAT SWITCH SUMP PROBE, AND LID ASSEMBLY. V { m "; q �I
<br /> 4 IL
<br /> 1, EXISTING TURBINE SUMPS, TO REMAIN, TYPICAL OF 4.
<br /> 5. EXISTING AUTOMATIC TANK GAUGES W/ MANWAY, TYPICAL. UPGRADE GASOLINE ASSEMBLIES AS REQUIRED BY E.V.R STANDARDS. S mq
<br /> m �
<br /> B. EXISTING INTERSTITIAL MONITOR W/ MANWAY. REPLACE MANWAY AS REQUIRED TYPICAL.
<br /> 0) iju
<br /> v I/ y { ' !I j. 10. REPLACE PEA GRAVEL BACKFILL AND REPLACE CONCRETE TANK SLAB REMOVED FOR PROJECT. SLAB SHALL MATCH EXISTING (5" MIN. E z
<br /> �/ THICKNESS) W/ 04 REBAR AT 15" BOTH WAYS, TYPICAL. W
<br /> A/W / _U
<br /> ,/ I /A 11. EXISTING VEEDER-ROOT MONITOR CONTROLS AND ALARM, W/ V15UAL 4 AUDIBLE ACCESSIBILITY. INSTALL NEW SYSTEM COMPONENTS FOR ADDED -�
<br /> L-------- ---- ----- - -- - --
<br /> - - -
<br /> - ----' SUMP PROBES, AS REQUIRED-
<br /> i
<br /> 12. SAWCUT 4 REMOVE PAVING AS REQUIRED. TRENCH AS NECE58ARY AND PROVIDE AND INSTALL NEW "HOMERUN" CONDUITS AND CONDUCTORS FROM
<br /> EACH DISPENSER TO WIREWAY AT BUILDING, 3 CONDUITS PER DISPENSER, TYPICAL. BACKtILL CONDUIT TRENCHING AND REPLACE ASPHALT
<br /> PAVING TO MATCH EXISTING,
<br /> O I I . f 13. 5AWGUT 4 REMOVE EXISTING ISLANDS, BOLLARDS, DISPENSERS, UNDER DISPENSER CONTAINMENT (UDC), PIPING (PRODUCT 4 VAPOR), PORTION OF
<br /> DRIVE SLAB AND DISPENSER CONDUITS IN THE ISLAND AREAS, TYPICAL. LU W
<br /> 0 I / / - '�•� 14. INSTALL NEW CONTAINED PIPING (PRODUCT AND VAPOR) IN ISLAND AREA. SLOPE PIPING 1/5" PER FOOT, MINIMUM, BACK TO EXISTING PIPING W
<br /> '� RI
<br /> MANIFOLDS (NOT SHOWN). CONNECT EXISTING LOW AND MID GRADE GASOLINE MANIFOLDS IN THE ISLAND AREA. MINIMUM PRIMARY PIPING SHALL
<br /> '4 MANIFOLDS
<br /> BE 2"41 PRODUCT, 3"0 VR (21'6 OK TO SINGLE DISPENSER).
<br /> 15. INSTALL NEW UNDER DISPENSER CONTAINMENT (UDC'S) AND SHEAR VALVE SYSTEMS, INSTALL NEW DISPENSERS. INSTALL SEAL-OFFS AS REQUIRED F-
<br /> AND WIRE PER MNFR'S. INSTALLATION REQUIREMENTS. TYPICAL OF 12 (SAT 3-0, 4 AT 3.1). = Q m W
<br /> T� / IS. INSTALL NEW BOLLARDS, TYPICAL. �-
<br /> ��
<br /> 11. INSTALL NEW ISLAND FORMS AROUND EXISTING CANOPY COLUMNS. MODIFY CANOPY DOWNSPOUT :i6 4EoUIRED. TYPICAL. -
<br /> i� T f _ _N 0.21' E 26288' —�y-- < -- � . �. " �:d3 '3'� j �, / 15. REPLACE CONCRETE ISLAND AND DRIVE SLAB. COMPLY WITH ADA AND STATE ACCESS REQUIRE"'1ENTS. SLAB SHALL MATCH EXISTING, W/ 04 �......�® A.�.,�.,..�.
<br /> �'i - - �' '� REBAR AT IS" BOTH WAYS, TYPICAL.
<br /> 19. REPLACE EXISTING DISPENSER MANAGEMENT SYSTEM W/ NEW, AS REQUIRED. W
<br /> /i ,.
<br /> I _
<br /> i
<br /> a0 GENERAL NOTES 02 z
<br /> O O r' (' :3m
<br /> A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE WITH UFC STANDARD 10-1AND A OTHERWISE U
<br /> D RP ND S 7 ERWISE REQUIRED BY ARTICLE 19 ,Q
<br /> I O 14 a ; '� IS 9 ` \` 1�-7" /'. (UFC 7901.5.3). MAINTAIN AT LEAST TWO PORTABLE FIRE EXTINGUISHERS (FE.) W/ A MINIMUM RATING OF 4-A,40-5,C AS SHOWN. THESE EXTINGUISHERS Q (L U
<br /> 101 �/� TO BE AFFIXED TO A LOCATION ON A MOUNTING BRACKET OR IN A FIRE EXTINGUISHER CABINET. U -�
<br /> / 1 lY
<br /> 3 , B. A CLEARLY LABELED, MANUALLY OPERATED PUMP MASTER SWITCH SHALL 8E PROVIDED IN AN APPROVED LOCATION WAN 100 FEET, BUT NOT Qi :r Q
<br /> NEARER THAN 20 FEET TO, ANY DISPENSER WHERE SUCH MASTER SWITCH 15 NOT VISIBLE FROM A;_L DISPENSERS THE LOCATION THEREOF SHALL '- I'- ,j) Q
<br /> BE INDICATED BY APPROVED SIGNS. SIGNS IDENTIFYING THE PUMP MASTER SWITCH A
<br /> GH 6H LL BE LABELED "EMERGENCY FUEL SHUTDOWN DEVICE".
<br /> i
<br /> A 13 15 (�' THE MASTER SWITCH ON ALL INDIVIDUAL PUMP CIRCUIT SWITCHES SHALL BE SET IN THE "OFF" POSITION BEFORE CL051NG THE STATION FOR BUSINESS
<br /> I {
<br /> AT ANY TIME. (UFC 5201-5.3)
<br /> FUELING C. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER MANUFACTURER'S INSTRUCTIONS, APPLICABLE CODES AND STANDARDS,
<br /> EXISTING, UPGRADED
<br /> � /j m THE PLANS AND SPECIFICATIONS, AND LOCAL AGENCY REQUIREMENTS.
<br /> I
<br /> EXIST. PAVING, TYP. W D. TANK 4 DRIVE SLAB CONCRETE SHALL BE CAPABLE OF PASSING A MINIMUM COMPRESSIVE STRENGTH OF 2500 Dai AFTER 28 DAYS. EXPANSION
<br /> r;
<br /> � JOINTS AT DRIVE AND TANK SLABS SHALL BE SEALED W/ FUEL COMPATIBLE MATERIALS.
<br /> .rte/
<br /> E. G.G. SHALL PAINT ALL EXPOSED METALS, UNLE58 PREFINISHED, W/ SUITABLE PAINT, APPROVED COLORS.
<br /> 42
<br /> —2:77-7
<br /> ,71i
<br /> j �
<br /> A/W AIR / WATER UNIT
<br /> 9 r F
<br /> /.
<br /> CO. SEWER CLEAN OUT PETROLEUM SHEET INDEX w
<br /> CEJ EXISTING >
<br /> ETR EXISTING, TO REMAIN
<br /> EXT. EXTERIOR
<br /> H A w RH. FIRE HYDRANT FET- PETROLEUM 51TE PLAN, NOTES
<br /> �'7 ^ J.P. JOINT (POWER, PHONE) POLE w
<br /> (N) NEW
<br /> R ® 1 W w�mF v
<br /> A D TYP. TYPICAL FET-2 PETROLEUM SYSTEM DETAILS J W Z O
<br /> �Qh3W
<br /> �_ XFR. ELECTRICAL TRANSFOF23 1I F- O F Q ' g ww ,
<br /> w _
<br /> 517E PLAN DEVELOPED FROM ASSESSOR MAPS AND FIELD Q. wp '�
<br /> REVIEW. THIS ISNOT A SURVEY. Nom° fig..
<br /> W sza
<br /> P E T R ,,`L i U M S I T E P L A N sj5 ,12� a g ?w
<br /> c
<br /> (USE GRAPHIC SCALE FOR REDUCED PLOTS) y,
<br /> r� �
<br /> cx ee1
<br /> 0 20 40 80
<br /> OF Z 5PEET5
<br />
|