My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:18:52 AM
Creation date
2/28/2020 8:40:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUNSPSC Environmental Services <br /> 210 West Sand Bank Road <br /> • JUN 0 5 2007 Columbia, Illinois 62236 <br /> ENVIRONMENT HEALTH Phone: 618-281-1543 Fax: 618-281-7020 <br /> p6gM111(', RVICES <br /> - LETTER OF TRANSMITTAL - <br /> TO: Ms. Margaret Lagorio DATE: May 24, 2007 <br /> REHS, Program Coordinator PROJECT NUMBER: 62403335 <br /> San Joaquin County PROJECT SITE: Sara Lee Bakery Group, Inc. <br /> Environmental Health Department (Former Colombo/Tuscana Bakery) <br /> 304 East Weber Avenue, Third Floor 1444 South Lincoln Street <br /> Stockton, California 95202-2708 Stockton, California 95206 <br /> (209) 468-3449 RWQCB Case Number: 390825 <br /> ® Enclosed <br /> NUMBER <br /> OF COPIES DESCRIPTION <br /> 1 Soil and Groundwater Quality Investigation Work Plan Addendum <br /> (May 24, 200 7) <br /> On behalf of Sara Lee Bakery Group, Inc. (Sara Lee), PSC Environmental Services (PSC) has <br /> enclosed a copy of the Soil and Groundwater Quality Investigation Work Plan Addendum. The <br /> addendum has been prepared in accordance with the March 1, 2007 Soil and Groundwater <br /> Quality Investigation Work Plan and the March 12, 2007 approval letter from the Central Valley <br /> Regional Water Quality Control Board. The addendum summarizes the site subsurface <br /> conditions from the investigation performed during the week of April 30, 2007. In addition, the <br /> addendum describes the locations and details of the proposed groundwater monitoring wells. <br /> The work plan addendum was written and prepared by ETIC Engineering, Inc. (ETIC) on behalf <br /> of PSC. Please call ETIC or myself with any questions. <br /> ORIGINAL FORWARDED TO: <br /> Mr. James Barton - CVRWCQB FROM: Paul Anderson <br /> TITLE: QA Director/Project Manager <br /> COPY FORWARDED TO: <br /> Ms. Jennifer Jordan—SWRCB <br /> Mr. Matt Gabris—Sara Lee <br /> Mr. Edward Overton—Property Owner <br /> S%S1 vod\USTSara l.ae\PmledlSlo (Lmooln Shw)\1—d9nM Sod&.GW(2007)\Wc l huWabw Addadn Ld1mgATs\M7_05_24-Well hmMUa Addomnn lona-IAT-WEND doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.