Laserfiche WebLink
a "c Environmental Health Department <br /> SAN JOAQUIN <br /> ` COUNTY Jasjit Kang, REHS, Director <br /> c Greatness grows here. Muniappa Naidu, REHS,Assistant Director <br /> '°gtrFoaN�' <br /> -..__. PROGRAM COORDINATORS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng, REHS <br /> Steven Shih, REHS <br /> Elena Manzo, REHS <br /> December 29, 2025 Natalia Subbotnikova, REHS <br /> To: San Joaquin County Community Development Department <br /> Attention: Brian Millar <br /> From: Aldara Salinas (209) 616-3019 FVIAILED <br /> Environmental Health Specialist DEC 3 1 2025 <br /> RE: PA-2200032, DEIR Phase 2, S00014807 <br /> 14320 W. Schulte Rd. Tracy BY: G\ <br /> The Environmental Health Department reviewed the DEIR for Phase 2 and has no additional <br /> comments to the previous response letter dated August 29, 2022. Other requirements may also <br /> apply. These requirements cannot be modified. <br /> 1. Submit Water Provision Declaration form to the Environmental Health Department for review. <br /> 2. Applicant shall contact Natalia Subbotnikova, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0338, to determine if the existing well can be permitted as a <br /> public water system prior to issuance of building permits. If a public water system is required, <br /> applicant shall submit a Small Public Water System preliminary technical report to the <br /> California State Water Resources Control Board, Division of Drinking Water (Water Board) <br /> at least six months before initiating construction of any water related improvement, as <br /> defined. The issuance of a permit to operate a small public water system by the local primacy <br /> agency (EHD) is prohibited without the concurrence of the Water Board. Please contact Gena <br /> Farley with the SWRCB Division of Drinking Water at Gena.Farley@waterboards.ca.gov or <br /> 209-948-7488, concerning the requirements for preliminary technical report submittal prior to <br /> issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, <br /> a permit application to operate Small Public Water System shall be submitted to the EHD for <br /> approval prior to issuance of building permits. To issue a permit to operate, concurrence from <br /> the Water Board is required. A yearly permit to operate a public water system will be required <br /> by the EHD prior to sign off of the certificate of final occupancy (San Joaquin County <br /> Development Title, Section 9-602.010 and 9-601.030.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 116570. <br /> 3. Construct a water well under permit and inspection of the Environmental Health Department <br /> prior to occupancy. Should the number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed four, a yearly permit to operate <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />