legal holidays and days preceding designated legal holidays, for the period necessary for erecting girders <br /> or removing the bridge and falsework. <br /> Regardless of the construction procedure,methods and equipment selected, the Contractor shall have <br /> necessary materials and equipment on the site to erect or remove the bridge and falsework in any one <br /> span or over any one opening prior to detouring or stopping public traffic, and shall erect or remove the <br /> bridge and falsework in an expeditious manner in order that inconvenience to public traffic will be at a <br /> minimum. <br /> The Contractor may occupy one 3.6-meter lane while placing or removing forms for the superstructure of <br /> bridges over Route 120(Yosemite Avenue), which is to remain open. Occupation of a traffic lane <br /> because of form work at a location will be permitted only during such times as construction operations <br /> are actually in progress and only during hours shown on the charts included in this section "Maintaining <br /> Traffic," designated legal holidays and days preceding designated legal holidays, or when necessary for <br /> the safety of public traffic. <br /> 12-1.14 CLOSURE REQUIREMENTS AND CONDITIONS <br /> Lane closures shall conform to the provisions in "Maintaining Traffic" of these special provisions and <br /> these special provisions. <br /> The term closure, as used herein, is defined as the closure of a traffic lane or lanes, including ramp or <br /> connector lanes,within a single traffic control system. <br /> 12-1.14.01 OSURE SCHEDULE.::.. <br /> the Contractor shalln <br /> defined as wsth the following exception. <br /> l i" + of the <br /> X <br /> .� _ . . ,y: _ �� .: <br /> proposed closure to be m e fect. <br /> Route Direction Type Stage Scope of Work Duration Occurrence Days Hours <br /> 120 EB Full I Girder erection of Span l 8 1 M- 0000-0800 <br /> Thurs <br /> 120 EB Full I Girder erection of Span 2 8 1 M- 0000-0800 <br /> Thurs <br /> 120 EB Full 1 Installation of deck forms 8 1 M- 0000-0800 <br /> Thurs <br /> 120 EB Full 1 Pile driving at the bents 24 1 M- <br /> Thurs <br /> 120 EB Full I Removal of deck forms 8 1 M- 0000-0800 <br /> Thurs <br /> 120 EB Full 2 Girder erection of Span 1 8 1 M- 0000-0800 <br /> Thurs <br /> 120 EB Full 2 Girder erection of Span 2 8 l M- 0000-0800 <br /> Thurs <br /> 120 EB Full 2 Installation of deck forms 8 1 M- 0000-0800 <br /> Thurs <br /> TS-26 3/8/05 ' <br />