SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers for Joan Avenue and shall maintain 2-way traffic, one-lane in each direction <br /> on Pershing Avenue. Work on Pershing Avenue shall be allowed during non-peak hours of 9:00 <br /> A.M. to 4:00 P.M. Road closure of Joan Avenue is not approved. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications. <br /> 6. All pipe and pipeline-related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by the City of Stockton. The City shall be responsible <br /> for any and all costs associated with the relocation and/or adjustment of these facilities as <br /> determined by the County at the City's expense. <br /> 7. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 8. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 9. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 10. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 11. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 12. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 13. Final trench paving shall be placed within two (2) weeks of completion of underground work. <br />