Laserfiche WebLink
GENEMS ENGINEERING 9 REDEVELOPMENT <br /> Ms. Amy Terrell <br /> August 21, 2006 <br /> Page 7 <br /> 4. A report summarizing site investigation will be submitted approximately 6 weeks after <br /> the sampling event. <br /> If you have any questions or comments, please contact me at (925) 417-0625. <br /> Respectfully submitted, <br /> Genesis Engineering&c Redevelopment, LLC <br /> Victor Fisher, Ph.D., R.G., C.E.G. <br /> Principal Geologist <br /> Attachments: as noted <br /> cc: Isola& Ruiz, LLP <br />