My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-201 thru EP-07-300_ - EP-07-266
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-201 thru EP-07-300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-201 thru EP-07-300_ - EP-07-266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:44:43 AM
Creation date
12/30/2015 9:52:02 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-266
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-201 thru EP-07-300
Year2
2007
Supplemental fields
Applicant
GEOSYNTEC CONSULTANTS
Contracts
CrossReference
Date Entered
8/30/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF WELTY RD. APPROX. 1,000 FT. N/O STE. HWY.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Amy Terrell <br /> 20 August 2007 <br /> Page 8 <br /> Sampling methods for the new wells will be the same methods used for the current monitoring <br /> well network. The monitoring program for the expanded pilot test is summarized in Table 1. <br /> Calscience Laboratories, Inc. of Garden Grove, California (Calscience) will perform all <br /> groundwater analyses during the pilot test and for future monitoring events. Calscience has <br /> extensive experience with analyses required for HRC remediation projects and is familiar with <br /> the analytical methods and detection limits needed to properly evaluate the pilot test. Geosyntec <br /> will review all data received from the laboratory for conformance to quality assurance and quality <br /> control (QA/QC)protocols. <br /> REPORTING <br /> The field work described in this Work Plan will be documented in the next routine monitoring <br /> report submitted to the RWQCB, which is anticipated to be the 2007 Annual Groundwater <br /> Monitoring Report. The report will contain a summary of field activities and results of the <br /> baseline groundwater testing. Data will be presented in tabular and graphical formats. <br /> Evaluations of the post-injection performance of the expanded pilot test will be presented in the <br /> quarterly monitoring reports as required by the MRP. <br /> SCHEDULE <br /> Fieldwork is tentatively scheduled to begin in early September 2007 in order to avoid seasonal <br /> rains at the Site. <br /> If you have any questions or comments on this work plan, please call either of the undersigned at <br /> (510) 285-2700. <br /> P:\PR12003REM\WFS\VER\VERF\:!007 Expanded Pilot Work Plan\Expanded_Pilot Test WP.doc <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.