My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-201 thru EP-07-300_ - EP-07-266
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-201 thru EP-07-300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-201 thru EP-07-300_ - EP-07-266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:44:43 AM
Creation date
12/30/2015 9:52:02 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-266
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-201 thru EP-07-300
Year2
2007
Supplemental fields
Applicant
GEOSYNTEC CONSULTANTS
Contracts
CrossReference
Date Entered
8/30/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF WELTY RD. APPROX. 1,000 FT. N/O STE. HWY.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GeoSyntec Consultants <br /> 2. KEY PERSONNEL AND HEALTH AND SAFETY RESPONSIBILITIES <br /> Table 1 lists project personnel and their responsibilities in regard to health and <br /> safety concerns on this project. <br /> 3. WORKER TRAINING <br /> Table 2 documents that workers have received the appropriate training <br /> requirements according to the company Environmental, Health, and Safety (EH&S) <br /> Training Program. A pre-entry briefing and daily tailgate meetings are also conducted <br /> to facilitate onsite training. <br /> 4. SITE CONTROL <br /> Site control procedures must be implemented before the start of site tasks to <br /> control worker exposures to hazardous substances. <br /> 4.1 Site Map <br /> A site map must be included in Figure 1. The following checklist of items must be <br /> included on the site map. Changes may be made to the site map by the SHSO, as <br /> needed, based on site conditions. The site map should be posted in the work area. <br /> • General Wind Direction <br /> • Evacuation Routes <br /> • Refuge Locations <br /> • Route to Nearest Hospital or Medical Assistance (may be provided on <br /> separate map) <br /> • Boundaries of Exclusion Zone (as described below) <br /> • Boundaries of Contamination Reduction Zone (as described below) <br /> • Boundaries of Support Zone(as described below) <br /> Vemalis_2007_HASP.doc 2 16 July 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.