Laserfiche WebLink
GeoSyntec Consultants <br /> 4.5. Visitors <br /> Visitors to the site must be continually escorted in order to assure their safety since <br /> they may be unfamiliar with the site. Visitors must not be allowed past the Support <br /> Zone unless they read, understand, sign, and meet the requirements outlined in this <br /> HASP. <br /> 4.6. Communications <br /> On-site communications must be conducted through the use o£ <br /> ® Verbal <br /> ❑ Two-way radio ❑ Horn <br /> ® Cellular telephone ❑ Siren <br /> ® Hand signals ❑ Other: <br /> Off-site communications must be conducted through the use of: <br /> ® Cellular telephone <br /> ❑ Pay phone: Location <br /> ❑ Other: <br /> 4.7. Safe Work Practices <br /> General Safe Work Practices that must be implemented during work activities at <br /> this site are included in Table 3. <br /> 4.8. Inspections <br /> For projects lasting longer than one week, the SHSO must conduct weekly health <br /> and safety inspections. The inspections must be documented using the Weekly Health <br /> & Safety Inspection checklist included in Appendix A. The Weekly Health & Safety <br /> Inspection Checklist must be kept on file at the project site. <br /> 5. HAZARD ANALYSIS AND MITIGATORS <br /> Site specific hazards must be identified (through hazard analysis) to determine the <br /> appropriate safety and health hazard mitigatory needed to protect workers from the <br /> Vemalis_2007_HASP.doc 4 161uly 2005 <br />