Laserfiche WebLink
Ai-SO llvc-WO S /207'x) A,04P 4 0CA7laJS 6-101 600 <br /> carpe Army epot <br /> The following Traffic Control Plan may be used for the roads in the attached figure along Roth <br /> Road. <br /> Description of County Maintained Roads: <br /> 1. Roth Road:Two-way single lane road;high traffic volume;45 mph;minimal shoulder <br /> along road <br /> 2. McKinley Ave:Two-way single lane road;high traffic volume; 55 mph <br /> 3. Vallejo Court:Two-way single lane road that dead ends;low traffic volume;25 mph <br /> Traffic Plan for Each Street <br /> All referenced figures or typical applications can be found in the 2003 Edition of the MUTCD. <br /> 1. Roth Road: <br /> a. During utility clearance,Roth Road will undergo a lane closure of the eastbound <br /> lane.Traffic control will conform to the Typical Application TA 3,TA 6,or TA <br /> 10(attached). <br /> b. During drilling and sampling,Roth Road will undergo a lane closure of the <br /> eastbound lane.Traffic control will conform to the Typical Application TA 3,TA <br /> 6, or TA 10.This task is estimated to take one to two days. <br /> c. Flaggers will be stationed at the east and west ends of the lane closure to control <br /> one-way traffic. <br /> 2. McKinley Avenue: <br /> a. During utility clearance,McKinley Avenue will undergo a lane closure of the <br /> northbound lane.Traffic control will conform to the Typical Application TA 11 <br /> (attached). <br /> b. During drilling and sampling,Roth Road will undergo a lane closure of the <br /> northbound lane.Traffic control will conform to the Typical Application TA 11. <br /> This task is estimated to take one to two days. <br /> c. Flaggers will be stationed at the north and south ends of the lane closure to <br /> control one-way traffic. <br /> 3. Vallejo Court <br /> a. During utility clearance,Vallejo Court will undergo a lane closure of the <br /> northbound lane.Traffic control will conform to the Typical Application TA 11 <br /> (attached). <br /> b. During drilling and sampling,Vallejo Court will undergo a lane closure of the <br /> northbound lane.Traffic control will conform to the Typical Application TA 11. <br /> This task is estimated to take one to two days. <br /> c. Flaggers will be stationed at the north and south ends of the lane closure to <br /> control one-way traffic. <br /> General Notes <br /> 1. All traffic control devices shall be installed in accordance with the 2003 Manual on <br /> uniform Traffic Control Devices(MUTCD). <br /> 2. Priority shall be given to emergency vehicles at all times. <br /> 3. Allow safe passage for pedestrian and bicycle traffic. <br /> ---- -- <br />