My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contractor's operations, occurred during the Contract work. All original pre-and post- <br /> construction video recording prints and digital files shall be delivered to the Owner and shall <br /> become the property of the Owner. <br /> D. Photographs <br /> Photographs shall be digital and shall indicate on the digital image the date, name of work, and <br /> location where the photograph was taken. The photographer shall be qualified and equipped to <br /> photograph either interior or exterior exposures, with lenses ranging from wide angle to _ <br /> telephoto. <br /> E. Video Recordings — <br /> Video recording shall be on DVD and shall indicate on the case the date, name of contract, and <br /> the location where the images were recorded. The recordings shall contain an audio tract which — <br /> narrates the progression through the site. All video recordings must display date and time of <br /> recording, and location. One copy of each recording shall be delivered to the Engineer and any <br /> copies required to meet requirements of permits within ten calendar days. The videographer <br /> shall be qualified and equipped to videotape either interior or exterior, with lenses ranging from <br /> wide angle to telephoto. <br /> F. Video <br /> The Contractor shall provide video recording taken along the proposed routing (in both <br /> directions) of the entire project, including staging, parking and trailer, and storage areas and the _ <br /> MacArthur pump station. <br /> No construction shall start until the preconstruction video recording has been completed and <br /> approved by the Engineer. <br /> After completion of construction and restoration, video recording shall be taken from the same — <br /> points in both directions as the preconstruction examination within seven calendar days after the <br /> acceptance of the project by the Owner. Final payment will not be made to the Contractor until <br /> the Owner receives copies of the video recordings which reflect the final conditions. <br /> G. Construction Photography <br /> Preconstruction: The Contractor shall provide preconstruction photos to the Engineer for each <br /> property prior to performing excavation on the property. <br /> Photographs shall be provided during construction to show all utility crossings, excavations for <br /> pipe, installation of pipe, removal and restoration of surface features such as trees, shrubs, rock <br /> retaining structures, fences, drainage canals and any items of special interest upon the request <br /> of the Engineer. <br /> Provide photographs taken on cutoff date for each scheduled application for payment. <br /> H. Recording <br /> After the Contract is awarded and before starting the work, the Contractor shall make a thorough <br /> examination of all the existing structures, vegetation, utilities, and general condition of the work _ <br /> Division III-27 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.