My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Noise Control <br /> Unless otherwise approved, construction involving noisy operations, including starting and <br /> warming up of equipment, shall be restricted to the hours between 7:30 A.M. and 4:30 P.M. on <br /> weekdays, and to the hours between 8:30 A.M. and 4:30 P.M. on Saturday. Noisy operations <br /> shall be scheduled to minimize their duration and to ensure their completion by 4:30 P.M. <br /> except for work required to be performed as specified outside the time restrictions. <br /> The Contractor shall comply with applicable laws, regulations, and ordinances which apply to <br /> any work performed pursuant to the contract. If the requirements of this section are more <br /> restrictive than those of the local regulations, the requirements of this section shall govern. <br /> Each internal combustion engine, used for any purpose on the job or related to the job, shall be <br /> enclosed and be equipped with a muffler of a type recommended by the manufacturer. No <br /> internal combustion engine shall be operated on the project without said muffler and enclosure. <br /> Contractor shall be required to locate all fixed construction equipment such as compressors and <br /> generators as far as feasibly possible from sensitive receptors. Contractor shall shroud or shield <br /> all impact tools. <br /> Where possible, the Contractor shall use electric rather than diesel or gas-powered equipment. <br /> There shall be no start-up of machines or equipment, no delivery of materials or equipment, no <br /> cleaning of machines or equipment and no servicing of equipment except during the permitted <br /> hours of construction involving noisy operations. <br /> Amplified sound and other forms of loud communication constituting a nuisance, at the sole <br /> discretion of the Engineer, shall not be permitted. <br /> If at any time during the performance of the work the noise limits are exceeded, the Contractor <br /> shall take immediate corrective actions through equipment modification, addition of noise <br /> abatement equipment, or modify construction-operating procedures. <br /> F. Water Pollution Control and Sediment Control <br /> The Contractor shall conform to the regulations and requirements of the City and legally <br /> authorized surface water management agencies. As a minimum, Contractor shall comply with <br /> General Construction Activities Storm Water Permit as adopted by the State Water Resources <br /> Control Board for construction sites of one acre or more. <br /> The City has filed a Notice of Intent to be covered under the General Construction Activities <br /> Storm Water Permit. As a condition of the permit, Contractor is required to prepare a Storm <br /> Water Pollution Prevention Plan detailing Best Management Practices (BMPs) for the <br /> minimization of storrnwater runofff effects to the surrounding ditches, storm drains, and <br /> detention basins. Contractor prepared Storm Water Pollution Prevention Plan shall comply with <br /> requirements of the General Construction Activities Storm Water Permit, and with additional <br /> provisions contain in these Special Provisions. Contractor prepared Storm Water Pollution <br /> Prevention Plan shall be submitted to the City in accordance with Section 01300, within 14 days <br /> of Notice to Proceed. <br /> July 2007 Division III-30 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.