My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Hauling <br /> When hauling is done over highways or city streets, the loads shall be trimmed and the vehicle <br /> shelf areas shall be cleaned after each loading. The loads shall be watered after trimming to <br /> eliminate dust. Confine truck traffic to truck route shown on Attachment B. <br /> C. Maintenance of Roadways <br /> All earthwork operations shall be performed in a manner which does not disrupt the continuous <br /> flow of traffic on existing roadways. All streets shall be swept clean daily where dirt and debris <br /> result from Contractor's operations. <br /> D. Finish Grading <br /> Finish grades and existing or natural grades in the area of work are indicated on the Drawings. <br /> The Contractor shall do all grading, filling or excavating as required to completely grade the site <br /> to lines and grades shown, and to provide for the indicated drainage. <br /> Provide minimum 12-inch topsoil layer in all areas outside areas to be paved or rocked. <br /> Compact topsoil to 85 percent of ASTM D1557 maximum dry density. <br /> Where finished grade corresponds practically with existing grade, the ground shall be worked up <br /> and graded off evenly with existing grade. Filled areas shall be compacted so as to prevent <br /> settlement, and the Contractor shall be responsible for a period of one year after final <br /> acceptance of the project to provide additional fill as necessary to bring to grade any areas <br /> which settle below the indicated grades and to replace or repair any planting or work damaged <br /> by such settlement. <br /> E. Tolerances <br /> Finished grade shall be to the line and grade shown on the plans to within a tolerance of plus or <br /> minus 0.05 ft. Allowance for topsoil and sub-base and pavement thickness shall be made so <br /> that the specified thickness can be applied to attain the finished grade. <br /> F. Control of Erosion <br /> The Contractor shall maintain earthwork surfaces true and smooth and protected from erosion. <br /> Erosion control measures, such as silt fences along the peripheries of construction sites, filter <br /> fabric, sedimentation ponds, temporary detention ponds, and terraced slopes, shall be <br /> employed as appropriate and shall be in place prior to any clearing or grading activity. <br /> 3.02 EXCAVATION <br /> A. General <br /> Excavation shall be in accordance with the grading plan indicated on the Drawings and as <br /> required for construction. Excavations shall be kept free from water while construction is in <br /> progress. The Engineer shall be notified immediately in writing in the event that it becomes <br /> necessary to remove soft, weak, or wet material. Wet excavated materials may need to be dried <br /> by aeration prior to being used as engineered fill. <br /> July 2007 Division III-58 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.