My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Pruning: Prune, thin out and shape trees and shrubs in accordance with <br /> standard horticultural practice. Do no pruning prior to approval by Engineer. <br /> 3.05 ASPHALT <br /> A. Restoration per Section 02510. — <br /> 3.06 CURB, GUTTER AND SIDEWALK <br /> A. Restoration per City Standards. <br /> 3.07 INSTALLATION —OTHER SITE FEATURES _ <br /> A. All other site features either damaged or destroyed during the execution of this <br /> contract shall be repaired or replaced to the satisfaction of the Engineer and the <br /> property owner or to the installation specifications of the manufacturer of the — <br /> approved replacement item. <br /> 3.08 WARRANTY <br /> A. Contractor shall warrant for a period of one (1) year from the date of final <br /> completion of the project that the plant materials used in the public right-of-way, <br /> easements, or private property are in good, healthy, and flourishing condition. <br /> During the one year warranty period, the Contractor shall replace any plant <br /> materials that are defective, have died, or failed to thrive. <br /> SECTION 03200 — CONCRETE REINFORCEMENT <br /> PART 1 - GENERAL <br /> 1.01 SUMMARY <br /> A. This Section specifies reinforcing steel for use in reinforced concrete. <br /> 1.02 SUBMITTALS <br /> A. Procedures: Section 01300. <br /> B. Shop Drawings and Product Data: <br /> 1. Technical data of reinforcing bars, dowel bars, and tie bars. <br /> 2. Reinforcing bar shop and placement drawings. <br /> 3. Bar lists and bending details. — <br /> 4. Bar tags. <br /> 1.03 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work - <br /> Division III-83 NEI Phase 11 Water and Sewer <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.