Laserfiche WebLink
B. Pruning: Prune, thin out and shape trees and shrubs in accordance with <br /> standard horticultural practice. Do no pruning prior to approval by Engineer. <br /> 3.05 ASPHALT <br /> A. Restoration per Section 02510. — <br /> 3.06 CURB, GUTTER AND SIDEWALK <br /> A. Restoration per City Standards. <br /> 3.07 INSTALLATION —OTHER SITE FEATURES _ <br /> A. All other site features either damaged or destroyed during the execution of this <br /> contract shall be repaired or replaced to the satisfaction of the Engineer and the <br /> property owner or to the installation specifications of the manufacturer of the — <br /> approved replacement item. <br /> 3.08 WARRANTY <br /> A. Contractor shall warrant for a period of one (1) year from the date of final <br /> completion of the project that the plant materials used in the public right-of-way, <br /> easements, or private property are in good, healthy, and flourishing condition. <br /> During the one year warranty period, the Contractor shall replace any plant <br /> materials that are defective, have died, or failed to thrive. <br /> SECTION 03200 — CONCRETE REINFORCEMENT <br /> PART 1 - GENERAL <br /> 1.01 SUMMARY <br /> A. This Section specifies reinforcing steel for use in reinforced concrete. <br /> 1.02 SUBMITTALS <br /> A. Procedures: Section 01300. <br /> B. Shop Drawings and Product Data: <br /> 1. Technical data of reinforcing bars, dowel bars, and tie bars. <br /> 2. Reinforcing bar shop and placement drawings. <br /> 3. Bar lists and bending details. — <br /> 4. Bar tags. <br /> 1.03 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work - <br /> Division III-83 NEI Phase 11 Water and Sewer <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />