My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Design, erect, support, brace, and maintain formwork to safely support vertical <br /> and lateral loads which will be applied until such loads can be supported safely <br /> by the concrete structure. <br /> B. Construct forms to the exact sizes, shapes, lines, and dimensions shown, and as <br /> required to obtain accurate alignment, location, grades, and level and plumb <br /> work in the finished structure. <br /> 3.05 MIXING CONCRETE <br /> A. Transit mix the concrete in accordance with provisions of ASTM C94. <br /> B. Do not use concrete that has stood for over 30 minutes after leaving the mixer, or <br /> concrete that is not placed within 90 minutes after water is first introduced into <br /> the mix. <br /> 3.06 PLACING CONCRETE <br /> A. Preparation: <br /> 1. Remove foreign matter accumulated in the forms. <br /> 2. Rigidly close openings left in the formwork. <br /> 3. Wet wood forms sufficiently to tighten up cracks; wet other material <br /> sufficiently to maintain workability of the concrete. <br /> 4. Use only clean tools. <br /> B. Conveying: <br /> 1. Perform concrete placing at such a rate that concrete which is being <br /> integrated with fresh concrete is still plastic. <br /> 2. Deposit concrete as nearly as practicable in its final location so as to <br /> avoid separation due to rehandling and flowing. <br /> 3. Do not use concrete which becomes non-plastic and unworkable, or does <br /> not meet required quality control limits, or has been contaminated by <br /> foreign materials. <br /> 4. Remove concrete from the work site that does not meet specifications. <br /> C. Placing Concrete in Forms: <br /> 1. Deposit concrete in horizontal layers not deeper than 24 inches, and <br /> avoid inclined construction joints. <br /> 2. Remove temporary spreaders in forms when concrete has reached the <br /> elevation of the spreaders. <br /> D. Placing Concrete Slabs: <br /> July 2007 Division III-88 <br /> NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.