My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
consistency shall be as required to achieve complete penetration in hairline cracks and <br /> larger. Material shall Buildder has lka Corporation <br /> Sikadur 52, <br /> Concresi e LPL, Adhesive Technology CorpoCorporation Master SLV 300 <br /> series, or equal. <br /> E. Polymer Concrete (For Resurfacing or Patching) — <br /> Polymer concrete (for resurfacing or patching) shall consist of a liquid binder and dry <br /> aggregate mixed together to make a mortar or grout of a consistency as required for the <br /> application. The liquid binder shall be a chemical and oil resistant, stress relieved, low <br /> modulus, moisture insensitive, two-component epoxy-resin compound. The consistency <br /> shall be similar to lightweight oil for proper mixing with aggregate. Material shall conform to <br /> ASTM C881 Type 3 Grade 1, such as Sika Corporation Sikadur Lo-Mod series, Adhesive <br /> Engineering Concresive 1470, Adhesive Technology Corporation 400 series, or equal. <br /> The aggregate shall be oven dry in sealed packages until time of mixing, and shall be of — <br /> size and consistency compatible with recommendations of manufacturer of liquid binder for <br /> intended application. _.. <br /> F. Adhesive Capsules For Dowel Anchorage <br /> Adhesive resin capsules shall consist of sealed glass capsules containing premeasured _ <br /> amounts of a polyester or vinylester resin, quartz sand aggregate and a hardener contained <br /> in a separate vial within the capsule. Adhesive capsules shall be Hilti HVA Capsules, Molly <br /> Parabond Capsules, or equal. -- <br /> 2.03 PRESSURE GROUTING EQUIPMENT <br /> Pressure grouting equipment shall include a mixer and holdover agitator tanks and shall be — <br /> designed to place grout at pressures up to 50 psi. Gages shall be provided to indicate pressure <br /> used. The mixer shall be provided with a meter capable of indicating to one-tenth of a cubic foot the <br /> volume of grout used. <br /> PART 3— EXECUTION _ <br /> 3.01 GENERAL <br /> Primer, if required for polymer concrete, shall be provided per manufacturer's recommendation. <br /> 3.02 DRYPACK GROUT <br /> Drypack grout shall be used for built-up surfaces, setting miscellaneous metal items and minor - <br /> repairs. <br /> Surfaces required to be built up with drypack grout shall be roughened by brushing, cleaned, and <br /> coated with bonding compound before the application of the grout. The drypack grout shall be <br /> applied immediately following the application of the bonding compound in bands or strips to form a <br /> covering of the required thickness. The covering <br /> beforll be smooth.e application is Construction joints in the grout <br /> shall be sloped and shall be cleaned and wetted <br /> Drypack grout shall be cured in accordance with Section 03300. <br /> Division III-93 NEI Phase II water and Sewer <br /> July 2007 CIP Nos.7468,7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.