My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.04 EXPANSION ANCHORS <br /> A. Use of expansion type anchors shall be subject to Conditions B-C and F-H <br /> specified in Paragraph 05501-3.03 and approval by the Engineer. Expansion <br /> anchors shall not be used without approval of the Engineer. <br /> B. The Contractor shall supply the Engineer with the current evaluation report from <br /> the International Conference of Building Officials for the particular brand of <br /> expansion anchors to be used. <br /> SECTION 09900 — COATING SYSTEMS <br /> PART 1 — GENERAL <br /> 1.01 DESCRIPTION <br /> The work covered by this section consists of furnishing all labor, equipment and material <br /> necessary to perform surface preparation and to furnish and apply all paint, protective coatings <br /> and finishes as specified herein and/or as indicated on the drawings. <br /> 1.02 SUBMITTALS <br /> In conformance with Section 01300, submit the following specific information: <br /> A. Manufacturer's product data sheets. <br /> B. Complete data on each type of paint and primer. This shall be done whether or <br /> not the product is named herein. <br /> C. Manufacturer's published application instructions. <br /> D. Color chart for each paint for color selection by City. <br /> 1.03 DELIVERY AND STORAGE <br /> All materials shall be delivered to the site in the manufacturer's sealed containers. Each <br /> container shall be labeled by the manufacturer, and the label shall be intact upon delivery. <br /> Labels shall give the manufacturer's name, brand, type of paint, batch number, color of paint, <br /> date of manufacture, storage life and instructions for reducing. Job mixing or job tinting may be <br /> done when approved by the Engineer and for sample colors. <br /> The Contractor shall store all paint materials and equipment in a storage place protected from <br /> weather and excessive heat and cold. Necessary precautions shall be taken to reduce hazards <br /> to a minimum. Materials exceeding the storage life recommended by the manufacturer, shall be <br /> removed from the site. <br /> 1.04 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> July 2007 <br /> Division III-104 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.