1. Galvanic anode cathodic protection of the polyethylene encased ductile <br /> iron water pipeline. <br /> 2. Galvanic anode cathodic protection of the polywrapped copper piping of <br /> the combination air release valves. <br /> 3. Installation of insulating joints to isolate new piping from existing piping, at <br /> changes of coating type or pipe type, and at beginning and end of new <br /> pipe receiving AC mitigation. <br /> 4. High voltage induced. AC mitigation measures at AC transmission line <br /> crossing and paralleling. These measures include the installation of test — <br /> stations, zinc ribbon anode, zinc grounding mats at test stations and at <br /> blow offs. <br /> 5. Trenching, drilling, and other excavation. <br /> 6. Backfill and compaction of backfill. <br /> 7. Provide shop drawings, reports, permits, and obtain Engineer's approval <br /> where required. _ <br /> 8. Correction of all deficiencies. <br /> 9. Cleanup and restoration of surface. <br /> 10. The work shall include the provision of all materials, equipment, and <br /> apparatus not specifically mentioned herein or noted on the plans, but -- <br /> which are obviously necessary to complete the work specified. <br /> 1.03 QUALITY ASSURANCE <br /> A. General <br /> All work shall be performed in accordance with the drawings and specifications and to <br /> the satisfaction of the Engineer. <br /> B. Materials <br /> The Contractor shall not substitute for the specified materials unless approved by the -- <br /> Engineer. <br /> C. Testing <br /> Proper operation of anodes, test leads and all other cathodic protection components <br /> shall be tested by a State of California Registered Professional Corrosion Engineer, <br /> retained by the Engineer, in order to ensure proper installation and operation. The <br /> Contractor shall be responsible for correction of all installation deficiencies identified by <br /> the testing and all costs incurred for retesting prior to final acceptance. <br /> D. Compaction <br /> Compaction of backfill for anodes and trenches shall match the existing conditions and <br /> shall be approved by the Engineer. <br /> 1.04 REQUIREMENTS <br /> A. Galvanic anode cathodic protection using prepackaged zinc anodes shall be <br /> installed on the ductile iron pipelines at the locations indicated on the drawings. <br /> B. Insulating joints and zinc ribbon anodes shall be installed along all pipe sections <br /> in the vicinity of high voltage AC transmission lines. <br /> Division III-133 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468,7589, 7590 <br />