My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. All appurtenances and fittings in the ductile iron pipeline shall be bonded and <br /> provided galvanic anode cathodic protection using prepackaged zinc anodes. <br /> D. Test stations shall be installed at the location designated on the drawings. <br /> 1.05 CODE REQUIREMENTS <br /> A. Materials, workmanship and installation shall conform to all requirements of the <br /> legally constituted authority having jurisdiction. These authorities include, but are <br /> not limited to, the latest revision of the State of California, Department of <br /> Industrial Relations, Division of Industrial Safety Orders of the Industrial Accident <br /> Commission; and all other applicable State, County, or City codes and <br /> regulations. Nothing in the drawings or specifications is to be construed to permit <br /> work not conforming to these regulations and codes. Where larger size or better <br /> grade materials than required by these regulations and codes are specified, the <br /> specifications and drawings shall have precedence. <br /> B. The 18-inch pipeline, which is being installed, is under the influence of high <br /> voltage AC from Station 301+10 to 422+66. If there is a ground fault with <br /> overhead transmission power lines lethal voltages may occur on the pipeline. <br /> Dry insulated boots, rubber gloves and other protective devices shall be used by <br /> the Contractor at all times in accordance with Section 5 of NACE RP0177-2000 <br /> "Mitigation of Alternating Current and Lightning Effects on Metallic Structures and <br /> Corrosion Control Systems". <br /> 1.06 REFERENCES <br /> This section contains references to the following documents. They are a part of this <br /> section as specified and modified. In case of a conflict between the requirements of this <br /> section and those of the listed documents, the requirements of this section shall prevail. <br /> A. ASTM - American Society for Testing and Materials <br /> B. IEEE - Institute of Electrical and Electronic Engineers <br /> C. IPCEA -- Insulated Power Cable Engineers Association <br /> D. NEMA -- National Electrical Manufacturers' Association <br /> E. NACE - National Association of Corrosion Engineers <br /> F. OSHA - Occupational Safety and Health Administration <br /> 1.07 CONTRACTOR SUBMITTALS <br /> A. At least 30 days prior to commencing work, the Contractor shall submit for <br /> approval by the Engineer copies of the following items in accordance with <br /> submittal procedures: A complete list of cathodic protection equipment and <br /> material, including name and manufacturer, catalog number, size, finish and any <br /> other pertinent data necessary for proper identification and to determine <br /> conformance with specifications. These items include but are not limited to: <br /> July 2007 Division III-134 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.