My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. The "System set-up" for factory testing shall consist of, but is not limited to all <br /> VFD panels, electrical enclosures, MCCs, LLC fully programmed and any <br /> miscellaneous associated electrical equipment. <br /> 3. Temporary wiring and equipment shall be setup during these tests to simulate <br /> the complete assembled system. <br /> 4. The length of the factory testing for the "System setup" shall be a minimum of <br /> five (5) working days. If in the opinion of the Owner or Engineer the factory <br /> testing is not completed at the end of the working day, the testing shall be <br /> extended, at no additional cost to the Owner or extension in Contract time. <br /> The Contractor shall agree that the sum set forth hereafter is a reasonable <br /> amount to be charged as liquidated damages, and it is therefore agreed that <br /> the Contractor will pay the Owner the sum of five hundred dollars ($500.00)in <br /> liquidated damages for each and every calendar day beyond the time <br /> prescribed above for the completion of factory testing for the System set-up. <br /> Liquidated damages will be assessed to the Contractor each and every day <br /> past the time allotted for factory testing. <br /> 5. All factory tests shall be conducted at the Supplier's facility. All factory tests <br /> shall be completed prior to shipment of any of the "System set-up" to the <br /> jobsite. The "System set-up" shall be fully assembled, programmed, and <br /> connected as it will be installed in the final configuration. If the"System set-up" <br /> is found to be not fully and completely ready for factory testing, the Contractor <br /> shall be responsible for paying for the Owner and Engineer to return for the <br /> factory testing. Factory testing is to ensure that there are no defects. The <br /> hardware and software shall be tested for compliance with the plans and <br /> Specifications included herein and for the ability to perform the control <br /> functions. <br /> 6. All components of the system setup shall be completely assembled and <br /> thoroughly pre-tested by the supplier or manufacturer before start of factory <br /> teat. <br /> 7. The associated factory tests for each of the factory testing sheets that are to <br /> be performed by the supplier and witnessed by the Owner/Engineer shall <br /> include the following for the "System set-up" as a minimum: <br /> a. Inspections of the panels as follows: <br /> 1) Visual and Mechanical <br /> a) Inspect for physical damage, proper support, and wiring. <br /> b) Check all starters, breakers, and other components for <br /> proper sizes. <br /> 2) The Contractor shall fill in test form TF4 located in Appendix "A". <br /> b. Testing of the LLCs as follows: <br /> 1) Each line of control logic on the elementary or loop diagrams shall <br /> be checked. After a line of control logic is tested, the person <br /> performing test shall initial the corresponding line on the <br /> elementary diagram. When the complete elementary diagram has <br /> been checked, it shall be signed and dated by testing person and <br /> person witnessing test. <br /> July 2007 Division III-220 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.