My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. The Contractor shall fill in & submit for approval the"Scheduled Test Request <br /> Form" located in Appendix"A"for each requested inspection,factory and field <br /> test. <br /> 9. The supplier shall submit for approval, the proposed factory & field testing <br /> sheets at least 24 days prior to the start of the tests. Each testing sheet shall <br /> have a title giving the type of test and entry spaces for the name of the person <br /> who performed the test, name of the person who witnessed the test, and the <br /> date. Tests performed without approved forms shall be retested at no <br /> additional cost to Owner. — <br /> 10. Separate test procedures in separate binders shall be submitted for approval <br /> for the Factory and Field Tests. Testing shall not commence until the test <br /> procedures have been reviewed and approved by the Owner. Tests forms <br /> shall be similar to those shown on Appendix "A". <br /> 11. If the results of any of tests are unacceptable to the Engineer, the Contractor <br /> shall make corrections and perform the tests again until they are acceptable to <br /> the Engineering; these additional tests shall be done at no additional cost to <br /> the Owner. <br /> B. Failure to Meet Test <br /> 1. Any system material or workmanship which is found defective on the basis of <br /> acceptance tests shall be reported to the Engineer. The Contractor shall <br /> replace the defective material or equipment and have tests repeated until test <br /> proves satisfactory to the Engineer without additional cost to the Owner. <br /> C. Safety <br /> 1. Testing shall conform to the respective manufacturer's recommendations.All <br /> manufacturer's safety precautions shall be followed. — <br /> 2. The procedures stated herein are guidelines for the intended tests, the <br /> Contractor shall be responsible to modify these tests to fit the particular <br /> application and ensure personnel safety. Absolutely no tests shall be <br /> performed that endanger personal safety. <br /> 3. The Contractor shall have two or more personnel present at all tests. _ <br /> 4. Two non-licensed portable radios are to be made available by the Contractor <br /> for the testing organization to conduct tests. <br /> 5. California Electrical Safety Orders (ESO)and Occupational Safety and Health <br /> Act (OSHA): The Contractor is cautioned that testing and equipment shall <br /> comply with ESO and OSHA as to safety, clearances, padlocks and barriers <br /> around electrical equipment energized during testing. <br /> 6. Field inspections and pre-energization tests shall be completed prior to <br /> applying power to equipment. — <br /> D. Electrical Factory Test <br /> 1. The System supplier shall conduct a thorough and complete factory test by <br /> qualified factory-trained personnel witnessed by Owner per the criteria <br /> specified herein. Factorytest shall be held within 150 miles of project location. <br /> Division III-219 NEI Phase II Water and Sewer — <br /> July 2007 CIP Nos.7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.