Laserfiche WebLink
Manual. The Contractor shall pay for the services of radio <br /> manufacturer's qualified and qualified Radio Technician to <br /> perform the following Setup and Field Tests and perform any of the manufacturer's recommendations based on the results of the <br /> tests. The Contractor shall notify the Owner or the Owner's <br /> representative one week in advance of the test in order to have all <br /> setup,tests, and adjustments performed by the Radio Technician <br /> witnessed by the Owner. The Contractor shall fill in Radio Test <br /> Form TF17 located in Section 16010 Appendix"A"and submitted <br /> to the Owner. The Radio Technician shall perform the following <br /> as a minimum: <br /> a) System Address -The Contractor shall configure the radio _ <br /> using the diagnostic software to use a system address <br /> (other than the default address the radio is shipped with)as <br /> directed by Owner. The station radio operating mode shall _ <br /> be as a remote. <br /> b) Data Rate - The communication's data rate shall be set to <br /> match existing radios. - <br /> c) Radio DC Voltage Check - The Contractor shall measure <br /> the supply voltage and adjust to the voltage rating with the _ <br /> transmitter keyed. During normal operation, re-measure the <br /> power supply voltage, and ensure that it does not drop <br /> below the minimum or above the maximum radio rating <br /> when switching between receive and transmit. -- <br /> d) Transmitter Power Output - Under Section 15.247 of the <br /> FCC Rules,the radio power must be reduced to a level that <br /> results in an effective isotropic radiated power(EIRP)signal - <br /> of the radio license. The EIRP is dependent on the radio <br /> transmit output power, the antenna feedline loss, and the <br /> antenna gain. Antenna gain shall be measured in the field - <br /> utilizing the VSWR or forward/reflected power method. <br /> Follow the manufacturer's recommended procedure to <br /> adjust the power output of the radio. Under no - <br /> circumstances should the radio's system EIRP exceed the <br /> radio license. <br /> e. Instrumentation Tests <br /> 1) The overall accuracy of each instrument loop shall be checked to <br /> ensure that it is within acceptable tolerance. _ <br /> a) As a minimum, all the tests indicated/specified on the test <br /> form TF14 in Appendix "A" shall be performed by the <br /> Contractor for each of the instruments listed in Appendix"B" - <br /> Device Index. <br /> 2) Test equipment used for testing shall be of suitable quality so as <br /> not to mask performance deficiencies.All test equipment shall be <br /> traceable to National Bureau of Standards and have been <br /> calibrated within six months of test date. <br /> Division III-227 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />