Laserfiche WebLink
demonstrated that it will operate under all modes of operations <br /> and varying conditions. <br /> 3) For the operational testing the new equipment shall be activated <br /> to automatically run for 5 days, 24 hours per day, Monday through <br /> Friday. During this five day period the Owner will run the different <br /> combinations of the monitoring options. If equipment failure <br /> occurs during the 5 days of operational testing, the Contractor <br /> shall repair or replace the defective equipment and shall begin <br /> another 5 day operational test, Monday through Friday. This shall _ <br /> be continued until the new equipment functions acceptably for 5 <br /> consecutive days. <br /> 3.08 OPERATION AND MAINTENANCE MANUALS <br /> A. Six(6)sets operating manuals covering instruction and maintenance on each type of <br /> equipment shall be furnished prior to completion of the project. _. <br /> B. These instructions shall provide the following as a minimum: <br /> 1. Each set bound in a three ring binder and organized as specified herein. _ <br /> 2. "As Constructed" set of submittal shop documents, data sheets, and <br /> drawings for all items in the electrical system. <br /> 3. A complete list of items supplied, including serial numbers, ranges, options, <br /> and other pertinent data necessary for ordering replacement parts. <br /> 4. Full technical specifications on each item. — <br /> 5. Detailed service, maintenance and operation instructions for each item <br /> supplied. Schematic diagrams of all electronic devices shall be included. A <br /> complete parts lists with stock numbers shall be provided on the components <br /> that make up the assembly. <br /> 6. Special maintenance requirements particular to this system shall be clearly — <br /> defined, along with special calibration and test procedures. <br /> 7. Safety precautions and procedures. <br /> 8. Include all completed and signed test data and forms from factory and field <br /> testing. <br /> of <br /> shed <br /> als ava <br /> g. le from <br /> ctu eprs such asies are fordthesLLC andd OIII All of theu <br /> manofamanualsashall be <br /> manufacturers <br /> originals. <br /> C. At the end of the project these manuals shall be updated to show "as-built or <br /> as-installed" conditions. <br /> D. Provide to the Owner four sets of Compact disks(CD-ROMs)containing all AutoCAD <br /> as-built electrical and instrumentation drawings and other computer generated <br /> documents prepared for this project, including LLC ladder logic files, OI setup files, <br /> and Bill of Materials. <br /> 3.09 TRAINING shall <br /> A. All training session shalabon e trained. <br /> aand times agreeable to Owner.A total of <br /> 5 or less Owner personnel <br /> Division III-229 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />