Laserfiche WebLink
« . <br /> ADDENDUM NO. 4 <br /> Date: August 28, 2007 <br /> Plan Holders of:Noriheast Industrial Phase II Water and Sewer Project <br /> CIP 7468, 7589, 7590 <br /> All prospective bidders are hereby notified that modification and/or changes are to be made to the <br /> specifications, plans and proposal documents for this project, as entitled above. The following items <br /> indicate additions and/or deletions to the above referenced documents, and are hereby made a part <br /> thereof and are subject to all applicable requirements there under as if originally shown and/or specified. — <br /> Bidders must sign and attach one (1)copy of this Addendum No. 4 to his/her proposal as <br /> acknowledgment of receipt of these instructions, and that said Addendum was properly evaluated in <br /> his/her proposal. Any proposal not in compliance with this requirement may be rejected. <br /> The documents of this project are hereby changed as follows: <br /> ITEM NO. 1 <br /> Division III, Section 02617, "Polyvinyl Chloride (PVC) Piping", Page III-74, Paragraph 2.01 (2)- <br /> the reference to psi is in error. The text of this section should read, Pipe and fittings requirements: <br /> PS 115, SDR 26. - <br /> ITEM NO. 2 <br /> Division III, Section 02617, "Polyvinyl Chloride (PVC) Piping", Page III-74, Paragraph 2.01 (4)- <br /> This paragraph shall be eliminated in It's entirety. As a clarification, gaskets shall be solid-wall <br /> rubber ring with push-on bell and splgotjoints conforming to ASTMIF477 fitting requirements, as <br /> specified in paragraph 2.01 (5)of this section. <br /> ITEM NO. 3 <br /> Division III, Section 02700, "Pre-cast Manholes and Inlets", Page 11177, Paragraph 2.02, "Frames <br /> and Covers", shall be replaced with the following paragraph: <br /> Manhole frames and covers shall conform to the Standard Specifications and the details <br /> shown on the Standard Plans. Frame and covers shall be 36 .,inch diameter cast iron <br /> with the lettering "SANITARY SEWER" cast into the top for sanitary sewers. In <br /> addition, all manhole covers in unpaved areas shall be boltldown type. <br /> All other items remain unchanged, including the bid opening which shall be Thursday,August 30, 2007 <br /> at 2:00 pkm. - <br /> Kul Sharma - <br /> City Engineer <br /> Addendum No.4 is hereby acknowledged by the bidder's signature. _ <br /> Name of Bidder's Company Authorized Signature — <br /> Date Title <br /> END OF ADDENDUM NO. 4 <br /> ■r■r■�■■wr■■�■■■r■■■..■■■.�■■rr■■�■■■■�■■■.■■■r■■■r■.■■■■ar■■fir■rr■■.■■■■r■r■r <br /> Addendum No. 4 -August 28, 2007 <br /> Northeast Industrial Phase II Water and Sewer Project <br /> CIP 7468. 7589, 7590 <br /> ("1n TT T C'1 T'l 000i. TCG Rf17 'V .I 7T: 111 1O07:R71fifl <br />