My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF CONTENTS <br /> NORTHEAST INDUSTRIAL PHASE II WATER AND SEWER PROJECT <br /> CIP NOS. 7468, 7589, 7590 <br /> DIVISION I - GENERAL REQUIREMENTS <br /> Location Map <br /> Notice Inviting Bids 1-1 <br /> Information to Bidders 1-3 <br /> DIVISION II - SPECIAL REQUIREMENTS <br /> Section 1 — Description of Work II-1 <br /> Section 2 — Definitions II-1 <br /> Section 3 — Contract Documents II-2 <br /> Section 4 — Permits, Drawings and Specifications II-3 <br /> Section 5 —Trade Names or Equals II-3 <br /> Section 6 — General Prevailing Rate for Per Diem Wages II-4 <br /> Section 7 — Superintendent II-4 <br /> Section 8 — Cooperation with Other Contractors II-4 <br /> Section 9 — Prosecution of Work II-5 <br /> Section 10 — Construction Limits II-5 <br /> Section 11 — Construction Staging / Field Office II-5 <br /> Section 12 — Hours of Construction II-6 <br /> Section 13 —Traffic Control and No Parking Signs 11-6 <br /> Section 14 — Maintaining Property Owner Access II-6 <br /> Section 15 — Preconstruction Conference II-6 <br /> Section 16 — Construction Sequence 11-7 <br /> Section 17 — Progress Schedule and Order of Work II-7 <br /> Section 18 — Progress Meetings 11-7 <br /> Section 19 — Pay Items II-7 <br /> Section 20 — Quantities 11-8 <br /> Section 21 — Extra Work 11-8 <br /> Section 22 — Recording Existing Conditions 11-9 <br /> Section 23 — Preservation of Property 11-9 <br /> Section 24 — Protection of Existing Utilities II-10 <br /> Section 25 — Project Site Safety 11-1 11 <br /> Section 26 — Dust, Noise and Water Pollution Control II-11 <br /> Section 27 — Disposal of Material II-12 <br /> Section 28 — Construction Water II-12 <br /> Section 29 —Water and Sewer Shutdown II-12 <br /> Section 30 — Construction Staking II-13 <br /> Section 31 — Inspection II-13 <br /> Section 32 —Testing II-13 <br /> Section 33 — "As-Built' Plans II-14 <br /> Section 34 — Liability and Insurance Requirements 11-14 <br /> Section 35 — Measurement and Payment II-17 <br /> Table of Contents <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.