Laserfiche WebLink
DIVISION III - SPECIAL PROVISIONS <br /> SECTION 1 — TRAFFIC CONTROL (BID ITEM 1) ...................................................................III-1 <br /> SECTION 2 — TRENCH EXCAVATION SAFETY (BID ITEM 2)...............................................III-7 <br /> SECTION 3 - WATER TRANSMISSION MAINS (BID ITEMS 3, 4, 5, 6, 7, 8, 9 AND 10).......111-8 <br /> SECTION 4 — NEI TANK SITE IMPROVEMENTS (BID ITEM 11)........................................III-11 <br /> SECTION 5 — SANITARY SEWER (BID ITEMS 12, 13, 14, AND 15)....................................III-11 <br /> SECTION 6 — MACARTHUR PUMP STATION PIPE REPLACEMENT (BID ITEM 16)........111-12 <br /> SECTION 7 — MACARTHUR PUMP STATION IMPROVEMENTS (BID ITEM 17)...............111-13 -- <br /> SECTION 01012 —WORK CONSTRAINTS ...........................................................................111-13 <br /> SECTION 01015 —TEMPORARY FACILITIES...............................................................".....111-15 <br /> 111-18 <br /> SECTION 01050 — CONSTRUCTION STAKING ................................................................... — <br /> SECTION 01060 — DISRUPTION OF EXISTING FACILITIES...............................................111-19 <br /> SECTION 01070 — EXCAVATION SHEETING AND SHORING ................................•••••.......III-22 <br /> SECTION 01300 — SUBMITTALS .......................................................................................... <br /> SECTION 01310 — CONSTRUCTION SCHEDULE ...............................................................III-24 <br /> SECTION 01380 — PHOTOGRAPHS AND VIDEO RECORDING .........................................111-26 <br /> _ <br /> SECTION 01560 — ENVIRONMENTAL CONTROLS ............................................................. <br /> SECTION 01660 — EQUIPMENT AND SYSTEM PERFORMANCE AND TESTING .............111-33 <br /> SECTION 01680 — COMMISSIONING AND FACILITY STARTUP........................................111-37 <br /> SECTION 01720 — RECORD DRAWINGS.............................................................................III-38 <br /> SECTION 01730 — OPERATING AND MAINTENANCE INFORMATION..............................111-39 <br /> SECTION 02050 — DEMOLITION...........................................................................................III-44 <br /> SECTION 02105 — SEWER BYPASSING....................................................... <br /> SECTION 02140 — CONTROL OF GROUNDWATER AND SURFACE WATER...................111-48 — <br /> SECTION 02160 — SITE PREPARATION ......................................................................."'....111-53 <br /> III-55 <br /> SECTION 02200 — EARTHWORK.......................................................................................... <br /> SECTION 02210 — CONTROLLED LOW STRENGTH MATERIAL........................................III-62 <br /> SECTION 02221 —TRENCHING, BACKFILLING AND COMPACTING ................................ <br /> SECTION 02510 —AC (ASPHALT CONCRETE) PAVEMENT RESTORATION AND AC <br /> OVERLAY (BID ITEMS 18, 19, 20, 21, 22, AND 23)...............................III-68 <br /> SECTION 02617 — POLYVINYL CHLORIDE (PVC) PIPING .................................................III-73 <br /> SECTION 02700 — PRE-CAST MANHOLES AND INLETS ...................................................III-76 <br /> SECTION 02800 — CLOSED-CIRCUIT TELEVISION PIPELINE INSPECTION ....................III-78 <br /> SECTION 02910 — SITE RESTORATION ..............................................................................III-80 <br /> SECTION 03200 — CONCRETE REINFORCEMENT ............................................................111-83 <br /> SECTION 03300 —CAST-IN-PLACE CONCRETE ....................................................• 111-90 <br /> SECTION03600 — GROUT.................................................................................................... <br /> SECTION 05500 — MISCELLANEOUS METALWORK..........................................................111-95 <br /> SECTION 05501 —ANCHOR BOLTS...................................................................................III-104 — <br /> SECTION 09900 —COATING SYSTEM .......................... <br /> .................................................. <br /> SECTION 11001 — GENERAL REQUIREMENTS FOR EQUIPMENT.................................111-110 <br /> SECTION 11050 — EQUIPMENT MOUNTING...............................................................•••.••111-119 <br /> SECTION 11100 — SLUICE GATES..................................................................................... — <br /> SECTION 11310 — SUBMERSIBLE WASTEWATER PUMPS......................................."''..III-128 <br /> 11-122 <br /> SECTION 11345 — SUBMERSIBLE SUMP PUMPS ............................................................ <br /> SECTION 11385 — CHEMICAL FEED AND ACCESSORIES ..............................................III-131 _ <br /> SECTION 13100 - CATHODIC PROTECTION (BID ITEM 24) ............................................111-132 <br /> SECTION 15100 — PIPING SYSTEMS.................................................................................111-147 <br /> SECTION 15200 —VALVES AND APPURTENANCES .......................................................III-161 <br /> SECTION 16100 — SIGNAL REPAIR AND RESTORATION...................................••...••......111-172 <br /> 111-167 <br /> SECTION 16010 — ELECTRICAL (BID ITEMS 25 AND 26) ............................................... <br /> Table of Contents <br /> Page 2 of 3 <br />