Laserfiche WebLink
SPECIAL PROVISIONS <br /> SECTION 1 TRAFFIC CONTROL (BID ITEM 11 <br /> A. Description <br /> f the <br /> ntractor to <br /> rovide for <br /> This section specifies traffic control work. It ltand coordinate hhe responsibility is ttraffic ocont of plan pwith other <br /> traffic control during construction and to instal <br /> contractors and utility companies. _ <br /> A truck route plan shall be prepared and sbThe as specified <br /> inSection <br /> allso identify thatidentifies <br /> to <br /> the truck route to be used during protect construction. not e <br /> reduce dust generation along the route (for <br /> tr�ction regulatiortions of the �st andthat <br /> provide trubk q eu'Idng <br /> limit hours of operation consistent with City cons <br /> locations away from off-site residences. <br /> The Contractor shall provide traffic control within the project's work area and comply with the <br /> klatest edition of the "Work Area Traffic Control Handbook" published Streets and Highways, (MUTCD), <br /> orrna s Standard Plans, May 2006, for <br /> nafterreferred to as the Traffic Control Manual a wn on the plans, described in these <br /> items r Ic co I I <br /> Special Provisions, and directed by the Engineer. _ <br /> Construction area signs shall be furnished,onstruacfion Area Signs" bclude temporary <br /> y the Contractor <br /> when no longer required. The term C _ <br /> object markers and portable delineators required Ct markerfor the dslrection of and portable public <br /> del delineatorstraffic <br /> through <br /> listed or <br /> around the work area during construction. 1 <br /> designated on the plans shall be furnished,econinstalled, <br /> area signs.ed, and removed by the _ <br /> Contractor in the same manner specified fo <br /> ty to <br /> ide <br /> The provisions in this section will not relieve te sures as may bector ronecelssarypto comply withthe <br /> such additional devices or take such mea <br /> ublic Conv <br /> ", of the City Standard <br /> provisions of Section 7.11, "Pcointrol s stem sadisplaced or ceases to operate <br /> Specifications. If any component In the traffic Yractor shall <br /> or function as specified from any cause during the progress of the work, the condition or replace said compoent and shall - <br /> immediately repair said component to Its original <br /> restore the component to its original location. <br /> Where construction is within City-owned and <br /> and pedestrians traffCounty-owned right-of-way or pr apound the <br /> and <br /> provisions shall be made for the safe passageof vehicularit <br /> area of the work at all times. Every effort shall <br /> operation.e de yLocalthe Cand eontractor to mergepcyntraff ccshall be <br /> ess into <br /> private driveways immediately after the paving <br /> given access to their destination through the project area. <br /> The Contractor shall be responsible for keeping <br /> theobsCity <br /> nsd County PolicecDepaor rt e t and <br /> City and County Fire Departments informed <br /> roads <br /> caused by his operations. <br /> Division III-1 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos.7468,7589,7590 <br />