My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Property Requirement <br /> Gel time minutes,maximum 30 <br /> On 3-mm cast sheet,cured 18 hours at 25°C,+5 hours at <br /> 70°C <br /> Tensile Strength,MPa 2.7 min. <br /> Elongation,percent 90 min. <br /> Shore D Hardness 45 min. <br /> Directions for Use: <br /> • Saw cuts shall be cleaned with compressed air to remove all excess moisture and debris. For repairing damaged saw <br /> cuts, all loose spalled material shall be cleaned away from the saw cut,chipping back to sound asphalt concrete or portland <br /> cement concrete and all loose material cleaned from loop wires. <br /> • The mixing ratio shall be in conformance with the manufacturer's recommendations. No more material shall be <br /> mixed than can be used within the gel time from the time mixing operations are started. <br /> • When automatic mixing equipment is used for mixing the sealant, the provisions in the twelfth paragraph in <br /> Section 85-1.06,"Placement,"shall apply. <br /> 95-2.10 (BLANK) <br /> 95-2.11 EPDXY RESIN ADHESIVE FOR INJECTION GROUTING OF PORTLAND CEMENT CONCRETE <br /> PAVEMENTS <br /> Directions for Use: <br /> • Both components and the mixed material shall contain no solvents. The mixing ratio of the components in terms of <br /> volume and mass shall be clearly stated. The material shall be suitable for use in the mixing equipment used by the <br /> applicator. Epoxy adhesive samples shall be furnished to the Engineer for testing at least 12 days before the expected time of <br /> use. <br /> Contract No. 10-OM7104 <br /> 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.