My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State of California <br /> Department of Transportation <br /> Publication Distribution Unit <br /> 1900 Royal Oaks Drive <br /> Sacramento,California 95815 <br /> Telephone: (916)445-3520 <br /> The Preparation Manual and other references for performing water pollution control work are available from the <br /> Department's Construction Storm Water and Water Pollution Control web site at: <br /> http://www.dot.ca.gov/hq/construc/stormwater/stormwaterl.htm <br /> The Contractor shall designate in writing a Water Pollution Control Manager(WPCM). The Contractor shall ensure that <br /> the WPCM is qualified to prepare and implement the WPCP. <br /> The WPCM shall be: <br /> 1. Responsible for water pollution control work. <br /> 2. The primary contact for water pollution control work. <br /> 3. Have authority to mobilize crews to make immediate repairs to water pollution control practices. <br /> The Contractor may designate one manager to prepare the WPCP and a different manager to implement the plan. <br /> WATER POLLUTION CONTROL PROGRAM <br /> The Contractor shall submit a Water Pollution Control Program(WPCP)to the Engineer for approval. The WPCP shall <br /> conform to the requirements in the Preparation Manual and these special provisions. <br /> The WPCP shall include water pollution control practices: <br /> A. For storm water and non-storm water from areas outside of the job site related to construction activities for this <br /> contract such as: <br /> 1. Staging areas. <br /> 2. Storage yards. <br /> 3. Access roads. <br /> B. Appropriate for each season as described in"Implementation Requirements"of these special provisions. <br /> The WPCP shall include a schedule that: <br /> A. Describes when work activities that could cause water pollution will be performed. <br /> B. Identifies soil stabilization and sediment control practices for disturbed soil area. <br /> C. Includes dates when these practices will be 25,50,and 100 percent complete. <br /> D. Shows 100 percent completion of these practices before the rainy season. <br /> The WPCP shall include the following temporary water pollution control practices and their associated contract items of <br /> work as shown on the plans or specified in these special provisions: <br /> A. Temporary Sediment Control <br /> 1. Street Sweeping <br /> B. Non-Storm Water Management <br /> 1. Construction Site Management <br /> C. Waste Management and Materials Pollution Control <br /> 1. Temporary Concrete Washout(Portable) <br /> Contract No. 10-OM7104 <br /> 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.