My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Welding inspection personnel or NDT firms to be used in the work shall not be employed or compensated by any <br /> subcontractor, or by other persons or entities hired by subcontractors, who will provide other services or materials for the <br /> project, except for when the welding is performed at a permanent fabrication or manufacturing facility which is certified <br /> under the AISC Quality Certification Program,Category Sbd,Conventional Steel Building Structures. <br /> Welding Qualification Audit <br /> Contractors or subcontractors performing welding operations for pole structures shall not deliver materials to the project <br /> without having successfully completed the Department's "Manufacturing Qualification Audit for Overhead Sign and Pole <br /> Structures," hereinafter referred to as the audit, not more than one year prior to the delivery of the materials. The Engineer <br /> will perform the audit. Copies of the audit form,and procedures for requesting and completing the audit, are available at the <br /> Transportation Laboratory or.at: <br /> http://www.dot.ca.gov/hq/esc/Translab/smbresources.htm <br /> An audit that was approved by the Engineer no more than one year prior to the beginning of work on this contract will be <br /> acceptable for the entire period of this contract, provided the Engineer determines the audit was for the same type of work <br /> that is to be performed on this contract. <br /> Successful completion of an audit shall not relieve the Contractor of the responsibility for furnishing materials or <br /> producing finished work of the quality specified in these special provisions and as shown on the plans. <br /> Welding Report <br /> For work welded in conformance with the provisions in Section 86-2.04, "Standards, Steel Pedestals and Posts," of the <br /> Standard Specifications, a Welding Report shall be submitted in conformance with the provisions in "Welding Quality <br /> Control"of these special provisions. <br /> PAYMENT <br /> Full compensation for conforming to the requirements of "Welding" shall be considered as included in the contract <br /> prices paid for the various items of work involved and no additional compensation will be allowed therefor. <br /> SECTION 9. (BLANK) <br /> SECTION 10. CONSTRUCTION DETAILS <br /> SECTION 10-1. GENERAL <br /> 10-1.01 ORDER OF WORK <br /> Order of work shall conform to the provisions in Section 5-1.05, "Order of Work," of the Standard Specifications and <br /> these special provisions. <br /> Temporary railing(Type:K)and temporary crash cushions shall be secured in place prior to commencing work for which <br /> the temporary railing and crash cushions are required. <br /> Attention is directed to"Water Pollution Control" of these special provisions regarding the submittal and approval of the <br /> Water Pollution Control Program prior to performing work having potential to cause water pollution. <br /> The first order of work shall be to place the order for the sign panels and electrical material. <br /> Prior to commencement of the traffic signal functional test at any location, all items of work related to signal control <br /> shall be completed and all roadside signs,pavement delineation,and pavement markings shall be in place at that location. <br /> 10-1.02 WATER POLLUTION CONTROL <br /> GENERAL <br /> Water pollution control work shall conform to the provisions in Section 7-1.01G, "Water Pollution," of the Standard <br /> Specifications, section of these special provisions entitled "Relations With California Regional Water Quality Control <br /> Board,"and these special provisions. <br /> The Contractor shall perform water pollution control work in conformance with the requirements in the "Storm Water <br /> Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual" and addenda in <br /> effect on the day the Notice to Contractors is dated. This manual is referred to as the "Preparation Manual." Copies of the <br /> Preparation Manual may be obtained from: <br /> Contract No. 10-OM7104 <br /> 133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.