My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. California Division of Oil and Gas, <br /> 8. Cal OSHA,or <br /> 9. Regional Water Resources Control Board. <br /> The WPCM shall oversee and enforce proper spill prevention and control measures. Minor, semi-significant, and <br /> significant spills shall be reported to the Contractor's WPCM who shall notify the Engineer immediately. <br /> The Contractor shall prevent spills from entering storm water runoff before and during cleanup. Spills shall not be <br /> buried or washed with water. <br /> The Contractor shall keep material or waste storage areas clean, well organized, and equipped with enough cleanup <br /> supplies for the material being stored. Plastic shall be placed under paving equipment when not in use to catch drips. <br /> MATERIAL MANAGEMENT <br /> Material shall be delivered, used, and stored for this contract in a manner that minimizes or eliminates discharge of <br /> material into the air,storm drain systems,or watercourses. <br /> The Contractor shall implement the practices described in this section when taking delivery of, using, or storing the <br /> following materials: <br /> A. Hazardous chemicals including: <br /> 1. Acids, <br /> 2. Lime, <br /> 3. Glues, <br /> 4. Adhesives, <br /> 5. Paints, <br /> 6. Solvents,and <br /> 7. Curing compounds; <br /> B. Soil stabilizers and binders; <br /> C. Fertilizers; <br /> D. Detergents; <br /> E. Plaster; <br /> F. Petroleum products including: <br /> 1. Fuel, <br /> 2. Oil,and <br /> 3. Grease; <br /> G. Asphalt components and concrete components;and <br /> H. Pesticides and herbicides. <br /> The Contractor shall supply the Material Safety Data Sheet to the Engineer for material used or stored. The Contractor <br /> shall keep an accurate inventory of material delivered and stored at the construction site. <br /> Employees trained in emergency spill cleanup procedures shall be present when hazardous materials or chemicals are <br /> unloaded. <br /> The Contractor shall use recycled or less hazardous products when practical. <br /> Application of herbicides and pesticides shall be performed by a licensed applicator. The Contractor shall complete the <br /> Report of Chemical Spray forms when spraying herbicides or pesticides, and shall submit a copy to the Engineer before <br /> application. <br /> Material Storage <br /> The Contractor shall store liquids,petroleum products,and substances listed in CFR Title 40,Parts 110, 117,and 302 in <br /> containers or drums approved by the United States Environmental Protection Agency, and place them in secondary <br /> containment facilities. <br /> Secondary containment facilities shall be impervious to the materials stored there for a minimum contact time of 72 <br /> hours. <br /> Throughout the rainy season secondary containment facilities shall be covered during non-working days and when <br /> precipitation is predicted. 'Secondary containment facilities shall be adequately ventilated. <br /> Contract No. 10-OM7104 <br /> 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.