Laserfiche WebLink
Chart No.3 <br /> Com lete Ram Closure Hours/Ram Lane Re uirements <br /> County: San Joaquin Route/Direction:5 SB On/Off Ram <br /> Closure Limits:At French Camp Road Undercrossing p 822.71 PM: 836.56 <br /> FROM HOUR TO HOUR 24 1 2 3 4 -57 <br /> 6 7 8 9 10 11 12 18 19 20 2122 23 24 <br /> 13 14 15 16 17 <br /> Mondays through Thursdays C C C C C S S S S S S S S S S S S S S S CCC C <br /> Fridays <br /> CCCCCS S S S S S S S S S <br /> Saturdays <br /> Sundays <br /> CCC C <br /> Le end: <br /> C Ramp may be closed completely. <br /> S Shoulder closure permitted <br /> No work permitted <br /> REMARKS:1. 7-day advance notice required. <br /> 10-1.11 CLOSURE REQUIIENHNTS AND CONDITIONS <br /> Closures shall conform to the provisions in "Maintaining Traffic" <br /> Provisions. of these special provisions and thesespecial <br /> CLOSURE SCHEDULE <br /> By noon Monday, the Contractor shall submit a written schedule of planned closures for the following week e <br /> defined as Sunday noon through the following Sunday noon. Closures involving work (temporary barrier lace <br /> paving operations) that will reduce horizontal clearances, traveled way inclusive of shoulders, to 2 lanes or less s period, <br /> submitted not less than 25 days and not more than 125 days before the anticipated start of operation. Closures in placement and <br /> work (pavement overlay, overhead signhall be <br /> available to the public, shall be submitted notless25 days and notsework and more than 125 dathat is before <br /> the vertical clearalnceg <br /> operation. y re the anticipated start of <br /> The Closure Schedule shall show the locations and times of the proposed closures. The Closure Schedule request f <br /> furnished by the Engineer shall be used. Closure Schedules submitted to the Engineer with incomplete or i <br /> information will be rejected and returned for correction and resubmittal. The Contractor will be notified of di forms <br /> Closures or closures that require coordination with other parties as a condition of approval. p disapproved <br /> inaccurate <br /> Closure Schedule amendments, including adding additional closures, shall be submitted by noon to the Engineer, in <br /> writing, at least 3 business days in advance of a planned closure. Approval of Closure Schedule amendments will <br /> discretion of the Engineer. <br /> The Engineer shall be notified of cancelled closures 2 business days before the date of closure. be at the <br /> Closures that are cancelled due to unsuitable weather may be rescheduled at the discretion of the Engineer. <br /> CONTINGENCY PLAN <br /> A detailed contingency g y plan shall be prepared for reopening closures to public traffic. If required by "Beginning of <br /> Work, Time of Completion and Liquidated Damages"of these special provisions, the contingency plan shall be submitted <br /> the Engineer before work at the job site begins. Otherwise, the contingency plan shall be submitted to the Engineer one business day of the Engineer's request. neewitto <br /> g neer within <br /> LATE REOPENING OF CLOSURES <br /> If a closure is not reopened to public traffic by the specified time, work shall be suspended in conformance with the <br /> Provisions in Section 8-1.05, "Temporary Suspension of Work,"of the Standard Specifications. No further closures are will be <br /> made until the Engineer has accepted a work plan, submitted by the Contractor, that will insure that future closures <br /> reopened to public traffic at the specified time. The Engineer will have 2 business days to accept or reject the Contractor's <br /> Contract No. 10-OM7104 <br /> 153 <br />